Inspection History Details
Inspection Status: Canceled
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/26/2024 | BULD - Electrical Clearance | Canceled | Canceled per contractor. 7/26/2024 | |
| 07/30/2024 | BULD - Electrical Clearance | Re-inspection required | Canceled per contractor. 7/26/2024 7/30/24: bracing at riser required min (2), Address tags must be properly fastened to panel, breakers must be installed at main panel, properly identify ungrounded conductors. |
|
| 08/14/2024 | BULD - Electrical Clearance | Passed | Canceled per contractor. 7/26/2024 7/30/24: bracing at riser required min (2), Address tags must be properly fastened to panel, breakers must be installed at main panel, properly identify ungrounded conductors. 8/14/24: ECO TEP CLEARANCE FOR 39 E VALESKA RD UNIT 1 AND UNIT 2 |
|
| 09/13/2024 | BULD - Electrical Clearance | Passed | Canceled per contractor. 7/26/2024 7/30/24: bracing at riser required min (2), Address tags must be properly fastened to panel, breakers must be installed at main panel, properly identify ungrounded conductors. 8/14/24: ECO TEP CLEARANCE FOR 39 E VALESKA RD UNIT 1 AND UNIT 2 9/11/24:ECO TEP CLEARANCE FOR 39 E VALESKA RD UNIT 1 AND UNIT 2 |
|
| 11/12/2024 | BULD - Electrical Clearance | Passed | 11/12/24 clearance for units 1 and 2 TEP CLEARANCE ECO |