Permit: TC-MDP-0324-00303
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6200 E CAMPOLINA TR
Address NEW:
6200 E CAMPOLINA TR
Apply Date:
03/08/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan
Permit Reviews
Permit Number - TC-MDP-0324-00303
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/23/2025 | APPROVED |
| 03/13/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/22/2024 | APPROVED |
| 10/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2025 | APPROVED |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00303
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan
| Date | Description | Comments |
|---|---|---|
| 03/22/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 03/22/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 03/08/2024 | Post-Tension Inspection Report is required. | |
| 03/08/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/08/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 03/22/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 03/22/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00303
Permite Description: Blackhawk H30D Model Plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | |
| 09/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required (with fee) | 9.25.25 Truss issue persists Reinspection requires fee |
| 09/25/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0324-00303
Permit Description: Blackhawk H30D Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2025 | COT - RSPL - Rough Soil | Passed | 9.4.2025 Okay to backfill, shading required. |
|
| 09/04/2025 | COT - RSPL - Sewer | Passed | 9.4.2025 Okay to backfill, shading required. |
|
| 09/04/2025 | COT - RSPL - Yard Water Line | Passed | 9.4.2025 Okay to backfill, shading required. |
|
| 09/12/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.12.25 APPROVED |
|
| 09/12/2025 | COT - RSBU - Preslab | Passed | 9.12.25 APPROVED |
|
| 09/12/2025 | COT - RSEL - Electrical Underground | Passed | 9.12.25 APPROVED |
|
| 09/12/2025 | COT - RSEL - Grounding/Bonding | Passed | 9.12.25 APPROVED |
|
| 09/30/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.3.25 Approved fix implemented. OK TO PROCEED WITH PROGRESS AREAS AS LONG AS TRUSS MARKINGS ARE LEFT UNCOVERED THROUGHOUT TO VERIFY FOR UPCOMING TRUSS FIX/LETTER |
|
| 10/03/2025 | RSBU - Building Progress | Passed | ||
| 10/08/2025 | BULD - Electrical Clearance | Passed | 10/8/25: ECO | |
| 10/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Approved | |
| 10/14/2025 | COT - RSBU - Roof Nailing | Passed | 10/14/25 Pass |
|
| 10/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/13/2025 | COT - BULD - SWG Clearance | Passed | 11/13/25 CLEARANCE SWG | |
| 11/19/2025 | COT - RSEL - Electrical Final | Passed | ||
| 11/19/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/21/2025 | COT - RSME - Mechanical Final | Passed | 11.21.2025 All corrections made. |
|
| 11/21/2025 | COT - RSPL - Plumbing Final | Passed | 11.21.2025 All corrections made. |
|
| 11/21/2025 | RSBU - Building Final | Passed | 11.21.2025 All corrections made. |
|
| 11/24/2025 | ENGR Engineering Final | Passed |