Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00288
Permit Details
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0324-00288
Permit Status: Issued
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/18/2024 | APPROVED |
04/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/08/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00288
Permit Status: Issued
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
04/03/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
04/03/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00288
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 8/23/24: wrap all plumbing pipe, stepped down at hold downs require 18" depth at hold downs, PT cable exposed more that 12" at stationary end. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0324-00288
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 8/15/2024 | |
08/15/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 8/15/2024 | |
08/15/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 8/15/2024 | |
08/15/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 8/15/2024 | |
08/27/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 8/27/2024 corrections have been made | |
08/27/2024 | COT - RSBU - Preslab | Passed | 8/27/2024 corrections have been made | |
08/27/2024 | COT - RSEL - Electrical Underground | Passed | 8/27/2024 corrections have been made | |
08/27/2024 | COT - RSEL - Grounding/Bonding | Passed | 8/27/2024 corrections have been made | |
09/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
09/09/2024 | COT - RSBU - Roof Nailing | Passed | ||
10/09/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 10/9/2024 | |
10/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-24-24, Circuits have been corrected to match approved plans. All additional items that required correction were taken care of. Intermediates approved-okay to continue build. | |
11/06/2024 | COT - RSBU - Interior Shear Bracing | Passed | 11-6-24, interior shear bracing approved. Okay to tape & texture drywall. | |
12/23/2024 | COT - BULD - SWG Clearance | Passed | SWG clearance approved 12/23/24 |