Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
03/29/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-0324-00288
Permit Status: Issued
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
10/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/18/2024 APPROVED Review Details
04/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00288
Permit Status: Issued
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
04/03/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/03/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/03/2024 Post-Tension Inspection Report is required.
03/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
04/03/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/03/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Issued
Permit Number: TC-MDP-0324-00288
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/23/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 8/23/24: wrap all plumbing pipe, stepped down at hold downs require 18" depth at hold downs, PT cable exposed more that 12" at stationary end.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0324-00288
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 15
Date Description Inspector Results Comments
08/15/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 8/15/2024
08/15/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 8/15/2024
08/15/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 8/15/2024
08/15/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading required. 8/15/2024
08/27/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 8/27/2024 corrections have been made
08/27/2024 COT - RSBU - Preslab Passed 8/27/2024 corrections have been made
08/27/2024 COT - RSEL - Electrical Underground Passed 8/27/2024 corrections have been made
08/27/2024 COT - RSEL - Grounding/Bonding Passed 8/27/2024 corrections have been made
09/09/2024 COT - RSBU - Exterior Clips/Sheathing Passed
09/09/2024 COT - RSBU - Roof Nailing Passed
10/09/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 10/9/2024
10/09/2024 COT - RSPL - Gas Pressure Test Passed
10/24/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 10-24-24, Circuits have been corrected to match approved plans. All additional items that required correction were taken care of. Intermediates approved-okay to continue build.
11/06/2024 COT - RSBU - Interior Shear Bracing Passed 11-6-24, interior shear bracing approved. Okay to tape & texture drywall.
12/23/2024 COT - BULD - SWG Clearance Passed SWG clearance approved 12/23/24

Documents

File Name Document Type  
LOT 133 FINAL SIC-2024-10-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 133 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 133 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 133 SPECIAL INSPECTION CERTIFICATE-2024-03-29_V1.PDF DOCUMENTS VIEW