Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0324-00288
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Move over pex from can light in 1st bathroom. Leak at bathroom vent line. Secure electrical lines in master closet. Add FHA plate behind kitchen hood. 10/9/2024 | |
10/10/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Move over pex from can light in 1st bathroom. Leak at bathroom vent line. Secure electrical lines in master closet. Add FHA plate behind kitchen hood. 10/9/2024 10/10/24: proper slope required at drain pan discharge, seal all penetrations at top plate, multiple branch circuits tied together (please revise plans to show wiring of home). |
|
10/24/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10-24-24, Circuits have been corrected to match approved plans. All additional items that required correction were taken care of. Intermediates approved-okay to continue build. |