Permit: TC-MDP-0324-00285
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
4747 E JULIAN WASH DR
Address NEW:
4747 E JULIAN WASH DR
Apply Date:
06/05/2024
Applicant:
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0324-00285
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
| 06/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/11/2024 | APPROVED |
| 02/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00285
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
| Date | Description | Comments |
|---|---|---|
| 06/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/06/2024 | Post-Installed Anchor Inspection Report is required. | |
| 06/06/2024 | Post-Tension Inspection Report is required. | |
| 03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/06/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00285
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 01/09/2025 Shims are still missing |
| 01/24/2025 | BULD - Electrical Clearance | N/A | Re-inspection required | 1/24/25 Wrong address label on the panel. |
| 01/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 01/24/25 1. H2.5 ties missing in master bedroom west wall. 2. Drywall screws holding light fixtures 3. Master bedroom Truss EJ41 calls for LUS 24 Hangars. 4. West wall in dining area circuit 18 needs to be on 12 AWG. And also on wrong circuit. 5. Master bedroom truss EG41H calls for HUS26 Hangars; the bottom chord is also cut short of top plate and is not supported. 6. Garage exterior lighting plan calls for 1 light and second light must be prewired. Missing prewiring. 7. Garage lighting plan calls for GFCI 72’’ above finished grade; missing junction box 70” above finished grade circuit 36 future solar. 8. 3 inch cleanout missing in master bathroom. |
| 04/10/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Provide k.o seal and finish labeling at main panel. 4/10/2025 |
| 04/10/2025 | COT - RSPL - Plumbing Final | N/A | Partial Pass | Partial pass. Leak at hose bib. Cut down grey water lines to grade. 4/10/2025 |
| 04/10/2025 | RSBU - Building Final | N/A | Re-inspection required | Per other notes. 4/10/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00285
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/09/2024 | COT - RSPL - Yard Water Line | Passed | 12-9-24, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill. | |
| 12/09/2024 | COT - RSPL - Sewer | Passed | 12-9-24, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill. | |
| 12/09/2024 | COT - RSPL - Rough Soil | Passed | 12-9-24, backwater valve, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill. | |
| 12/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and hold downs per plans, ok to pour concrete 12/13/24 | |
| 12/13/2024 | COT - RSEL - Electrical Underground | Passed | Passed 12/13/24 | |
| 12/13/2024 | COT - RSEL - Grounding/Bonding | Passed | Passed 12/13/24 | |
| 12/16/2024 | COT - RSBU - Preslab | Passed | Ready to pour concrete 12/16/24 | |
| 01/03/2025 | COT - RSBU - Roof Nailing | Passed | Passed 1/3/25 | |
| 01/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/13/25 corrections made | |
| 01/24/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 02/04/2025 | BULD - Electrical Clearance | Passed | 2/4/25 correction address has been placed on panel. Approval for TEP ECO |
|
| 02/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/4/25 corrections have been made. OK to proceed. | |
| 02/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear 2/13/25 | |
| 04/03/2025 | COT - BULD - SWG Clearance | Passed | 28 March 25 SOUTHWEST GAS CLEARANCE: SWG 3 April 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 04/10/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/10/2025 | COT - RSME - Mechanical Final | Passed | ||
| 04/10/2025 | ENGR Engineering Final | Passed | CO READY | |
| 04/10/2025 | RSBU - Building Progress | Passed | ||
| 04/15/2025 | COT - RSEL - Electrical Final | Passed | 4/15/25 passed final | |
| 04/15/2025 | COT - RSPL - Plumbing Final | Passed | 4/15/25 passed final | |
| 04/15/2025 | RSBU - Building Final | Passed | 4/15/25 passed final |