Permit: TC-MDP-0324-00285
Permit Details
Apply Date:
06/05/2024
Applicant:
Daria Hopkins
Description:
SFR MERI156021 T21-M0063
Permit Reviews
Permit Number - TC-MDP-0324-00285
Permit Status: Inspections
Permit Description: SFR MERI156021 T21-M0063
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/09/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/09/2024 | APPROVED |
06/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/11/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0324-00285
Permit Status: Inspections
Permit Description: SFR MERI156021 T21-M0063
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/06/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/06/2024 | Post-Installed Anchor Inspection Report is required. |
06/06/2024 | Post-Tension Inspection Report is required. |
06/06/2024 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0324-00285
Permit Status: Inspections
Permit Description: SFR MERI156021 T21-M0063
Date | Description | Comments |
---|---|---|
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/06/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0324-00285
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/09/2024 | COT - RSPL - Yard Water Line | Passed | 12-9-24, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill. | |
12/09/2024 | COT - RSPL - Sewer | Passed | 12-9-24, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill. | |
12/09/2024 | COT - RSPL - Rough Soil | Passed | 12-9-24, backwater valve, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill. | |
12/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and hold downs per plans, ok to pour concrete 12/13/24 | |
12/13/2024 | COT - RSEL - Electrical Underground | Passed | Passed 12/13/24 | |
12/13/2024 | COT - RSEL - Grounding/Bonding | Passed | Passed 12/13/24 | |
12/16/2024 | COT - RSBU - Preslab | Passed | Ready to pour concrete 12/16/24 |