Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0324-00285

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Re-inspection required

Date Description Inspector Results Comments
01/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 01/24/25

1. H2.5 ties missing in master bedroom west wall.

2. Drywall screws holding light fixtures

3. Master bedroom Truss EJ41 calls for LUS 24 Hangars.

4. West wall in dining area circuit 18 needs to be on 12 AWG. And also on wrong
circuit.

5. Master bedroom truss EG41H calls for HUS26 Hangars; the bottom chord is also cut short of top plate and is not supported.

6. Garage exterior lighting plan calls for 1 light and second light must be prewired. Missing prewiring.

7. Garage lighting plan calls for GFCI 72’’ above finished grade; missing junction box 70” above finished grade circuit 36 future solar.

8. 3 inch cleanout missing in master bathroom.
02/04/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/4/25 corrections have been made. OK to proceed.