Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
4751 E JULIAN WASH DR
Apply Date:
06/05/2024
Applicant:
Description:
SFR MERI156021 T21-M0063

Permit Reviews

Permit Number - TC-MDP-0324-00284
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Start Date Submittal Complete Date Status  
06/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 06/11/2024 APPROVED Review Details
10/09/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/09/2024 APPROVED Review Details
02/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/13/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0324-00284
Permit Status: Complete
Permit Description: SFR MERI156021 T21-M0063
Date Description Comments
06/06/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
06/06/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/06/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/06/2024 Post-Tension Inspection Report is required.
03/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
03/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/06/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/06/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0324-00284
Permite Description: SFR MERI156021 T21-M0063
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/30/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required Gable end bracing not per plan, anchor bolts and shop pins throughout, h25 clips at marked areas, support or replace damaged studs, add stud flush to truss at marked location, shim marked area in garage to account for roof weight, Reinspection required
12/30/2024 COT - RSBU - Roof Nailing N/A Re-inspection required Gable end bracing not per plan, anchor bolts and shop pins throughout, h25 clips at marked areas, support or replace damaged studs, add stud flush to truss at marked location, shim marked area in garage to account for roof weight, Reinspection required

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0324-00284
Permit Description: SFR MERI156021 T21-M0063
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/09/2024 COT - RSPL - Yard Water Line Passed 12-9-24, backwater valve, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill.
12/09/2024 COT - RSPL - Sewer Passed 12-9-24, backwater valve, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill.
12/09/2024 COT - RSPL - Rough Soil Passed 12-9-24, backwater valve, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill.
12/09/2024 COT - RSPL - Backwater Valve Passed 12-9-24, backwater valve, underground plumbing, main water line, and sewer connection verified as per approved plans. Okay to backfill.
12/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and hold downs per plans, ok to pour concrete 12/13/24
12/13/2024 COT - RSBU - Preslab Passed Rebar and hold downs per plans, ok to pour concrete 12/13/24
12/13/2024 COT - RSEL - Electrical Underground Passed Rebar and hold downs per plans, ok to pour concrete 12/13/24
12/13/2024 COT - RSEL - Grounding/Bonding Passed Rebar and hold downs per plans, ok to pour concrete 12/13/24
01/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/3/24 corrections made
01/03/2025 COT - RSBU - Roof Nailing Passed 1/3/24 corrections made
01/22/2025 COT - RSPL - Gas Pressure Test Passed 1/22/25 pass
01/23/2025 BULD - Electrical Clearance Passed 1/23/25 pass approval for TEP ECO
01/23/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/23/25 corrections have been made. PASS
02/06/2025 COT - RSBU - Interior Shear Bracing Passed Passed interior shear 2/6/25
03/24/2025 COT - BULD - SWG Clearance Passed Passed SW GAS CLEARANCE 3/24/25
04/07/2025 COT - RSEL - Electrical Final Passed
04/07/2025 COT - RSEL - Outdoor Lighting Passed
04/07/2025 ENGR Engineering Final Passed CO READY
04/07/2025 RSBU - Building Progress Passed
04/09/2025 COT - RSPL - Plumbing Final Passed
04/10/2025 COT - RSME - Mechanical Final Passed 4/10/2025 corrections were made.
04/10/2025 RSBU - Building Final Passed 4/10/2025 corrections were made.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
241720 - VALENCIA CROSSING PH 2 LOT 106 - FINAL PT-2025-02-07_V1.PDF DOCUMENTS VIEW
LOT 106 REVISED SPECIAL INSPECTION CERTIFICATE-2024-10-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 106 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 106 SPECIAL INSPECTION CERTIFICATE-2024-06-05_V1.PDF DOCUMENTS VIEW