Inspection Status: Passed
Inspection History: COT - RSBU - Roof NailingĀ
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2025 |
COT - RSBU - Roof NailingĀ |
|
Passed |
1/3/24 corrections made |
| 12/30/2024 |
COT - RSBU - Roof NailingĀ |
|
Re-inspection required |
Gable end bracing not per plan, anchor bolts and shop pins throughout, h25 clips at marked areas, support or replace damaged studs, add stud flush to truss at marked location, shim marked area in garage to account for roof weight, Reinspection required |