Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00273
Permit Details
Apply Date:
03/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0324-00273
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/23/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
03/06/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/18/2024 | APPROVED |
10/29/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/29/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00273
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Date | Description | Comments |
---|---|---|
03/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/18/2024 | Post-Tension Inspection Report is required. | |
03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
03/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00273
Permite Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/21/2024 | COT - RSEL - Outdoor Lighting | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00273
Permit Description: SFR MER1301460 T21-M0072 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/13/2024 | COT - RSPL - Backwater Valve | Passed | ||
06/13/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/13/2024 | COT - RSPL - Sewer | Passed | ||
06/13/2024 | COT - RSPL - Rough Soil | Passed | ||
06/26/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
06/26/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
06/26/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
06/26/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed and inspected by 3rd party contractor, rebar reinforcement is properly installed per plan, underground electrical for kitchen island is installed, Ufer ground is installed on electrical panel side of garage, all plumbing pipes are wrapped with foam, shear wall hold downs are secured to form, and masa clips are evenly secured to concrete forms. Okay to pour concrete for footings and slab. | |
07/11/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/02/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/02/2024 | BULD - Electrical Clearance | Passed | ||
08/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8/5/24: Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
08/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls drywall is properly secured to studs with screws per plan requirements. Okay to proceed with tape, texture, and painting of interior walls and ceilings. | |
10/14/2024 | COT - BULD - SWG Clearance | Passed | 10-14-24, Approved for Southwest Gas connection. | |
10/21/2024 | RSBU - Building Final | Passed | ||
10/21/2024 | RSBU - Building Progress | Passed | ||
10/21/2024 | COT - RSEL - Electrical Final | Passed | ||
10/21/2024 | COT - RSME - Mechanical Final | Passed | ||
10/21/2024 | COT - RSPL - Plumbing Final | Passed | ||
10/29/2024 | ENGR Engineering Final | Passed |