Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0324-00271
Permit Details
Apply Date:
03/05/2024
Applicant:
Charles Anderson
Description:
SALT Model Emery Park Place Duplex
Permit Reviews
Permit Number - TC-MDP-0324-00271
Permit Status: Complete
Permit Description: SALT Model Emery Park Place Duplex
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/17/2024 | RESTAMP - RESIDENTIAL v.1 | 06/20/2024 | APPROVED |
| 04/01/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/03/2025 | REQUIRES RESUBMIT |
| 03/08/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 03/26/2024 | REQUIRES RESUBMIT |
| 04/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 04/14/2025 | APPROVED |
| 05/02/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 05/23/2024 | REQUIRES RESUBMIT |
| 06/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/27/2024 | APPROVED |
| 06/10/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 06/17/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0324-00271
Permit Status: Complete
Permit Description: SALT Model Emery Park Place Duplex
| Date | Description | Comments |
|---|---|---|
| 03/08/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 03/05/2024 | Post-Tension Inspection Report is required. | |
| 03/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 05/14/2024 | A Special Inspections Intermediate Certificate must be submitted and reviewed prior to issuance of this permit. | |
| 03/05/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00271
Permite Description: SALT Model Emery Park Place Duplex
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/21/2024 | COT - RSBU - Roof Nailing | N/A | Partial Pass | 10/21/24: roof sheathing fastened per schedule ok to dry-in. |
| 03/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 3-25-25, not applicable. |
| 03/28/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0324-00271
Permit Description: SALT Model Emery Park Place Duplex
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/04/2024 | COT - RSPL - Rough Soil | Passed | 9/4/24: plumbing underground per plans ok to proceed with backfill. Shading required. | |
| 09/17/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Okay for concrete placement. 9/19/2024 | |
| 09/19/2024 | COT - RSBU - Preslab | Passed | Approved. Okay for concrete placement. 9/19/2024 | |
| 09/19/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/09/2024 | RSBU - Building Progress | Passed | 10/8/24: masonry wall passed ok to proceed. | |
| 11/26/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 01/06/2025 | BULD - Electrical Clearance | Passed | Passed electrical CLEARANCE ECO 1/6/24 | |
| 01/06/2025 | COT - RSPL - Backwater Valve | Passed | 1/6/25 plumbing per plan, ok to backfill | |
| 01/06/2025 | COT - RSPL - Sewer | Passed | 1/6/25 plumbing per plan, ok to backfill | |
| 01/06/2025 | COT - RSPL - Yard Water Line | Passed | 1/6/25 plumbing per plan, ok to backfill | |
| 03/25/2025 | COT - RSBU - Roof Nailing | Passed | 3-25-25, approved. | |
| 03/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/28/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/28/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/28/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/28/2025 | RSBU - Building Final | Passed | ||
| 04/02/2025 | COT - RSEL - Electrical Final | Passed | ||
| 04/02/2025 | ENGR Engineering Final | Passed | CO Ready |