Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Preslab
Permit Number - TC-MDP-0324-00271
Inspection Description - COT - RSBU - Preslab
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | COT - RSBU - Preslab | Re-inspection required | 9/13/24: approved plans not on site, damaged sheathing at pt tendons must be addressed, rebar must have a minimum clearance from earth of 3", pad must be properly compacted, all plumbing encased in concrete must be properly wrapped. STOPPED INSPECTION MORE ITEMS MAY BE ADDED. | |
09/17/2024 | COT - RSBU - Preslab | Re-inspection required | Pad is loose. Needs compaction. Provide reinforcement to tubs. 9/17/2024 | |
09/19/2024 | COT - RSBU - Preslab | Passed | Approved. Okay for concrete placement. 9/19/2024 |