Permit: TC-MDP-0323-00806
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9137 E INDIGO BLUFF ST
Address NEW:
9137 E INDIGO BLUFF ST
Apply Date:
03/22/2023
Applicant:
Celina Rodriguez
Description:
SFR BT2191-30 T22-M0009 (Model master plan TC-MDP-0123-00357)
Permit Reviews
Permit Number - TC-MDP-0323-00806
Permit Status: Inspections complete
Permit Description: SFR BT2191-30 T22-M0009 (Model master plan TC-MDP-0123-00357)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 01/30/2025 | REQUIRES RESUBMIT |
| 01/30/2025 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 01/30/2025 | REQUIRES RESUBMIT |
| 02/27/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 03/11/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00806
Permit Status: Inspections complete
Permit Description: SFR BT2191-30 T22-M0009 (Model master plan TC-MDP-0123-00357)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/05/2025 | Post-Installed Anchor Inspection Report is required. |
| 03/05/2025 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0323-00806
Permit Status: Inspections complete
Permit Description: SFR BT2191-30 T22-M0009 (Model master plan TC-MDP-0123-00357)
| Date | Description | Comments |
|---|---|---|
| 02/27/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/22/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00806
Permit Description: SFR BT2191-30 T22-M0009 (Model master plan TC-MDP-0123-00357)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2025 | COT - RSPL - Yard Water Line | Passed | 3-17-25, main water line, sewer connection & underground plumbing inspection approved. Okay to backfill-shading required. | |
| 03/17/2025 | COT - RSPL - Sewer | Passed | 3-17-25, main water line, sewer connection & underground plumbing inspection approved. Okay to backfill-shading required. | |
| 03/17/2025 | COT - RSPL - Rough Soil | Passed | 3-17-25, underground plumbing inspection approved. Okay to backfill-shading required. | |
| 03/21/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 3/21/25 ok to pour concrete | |
| 03/21/2025 | COT - RSBU - Preslab | Passed | Passed 3/21/25 ok to pour concrete | |
| 03/21/2025 | COT - RSEL - Electrical Underground | Passed | Passed 3/21/25 ok to pour concrete | |
| 04/09/2025 | COT - RSBU - Roof Nailing | Passed | 4-9-25, roof nailing/exterior clips/sheathing approved. Okay to continue with construction. | |
| 04/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4-9-25, exterior clips/sheathing approved. Okay to continue with construction. | |
| 04/18/2025 | BULD - Electrical Clearance | Passed | 4/18/25 TEP CLEARANCE: ECO |
|
| 04/18/2025 | COT - RSEL - Grounding/Bonding | Passed | 4/18/25 Pass |
|
| 04/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Panel not per schedule, should have 12 15amp circuits, currently has 5. DWV not on test, caulk penetrations at marked areas throughout. | |
| 04/22/2025 | COT - RSPL - Gas Pressure Test | Passed | Passed 4/22/25 | |
| 05/06/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/6/25 | |
| 06/10/2025 | COT - BULD - SWG Clearance | Passed | Ready for meter CLEARANCE SWG | |
| 06/23/2025 | COT - RSEL - Electrical Final | Passed | 6/23/25 final passed | |
| 06/23/2025 | COT - RSEL - Outdoor Lighting | Passed | 6/23/25 final passed | |
| 06/23/2025 | COT - RSME - Mechanical Final | Passed | 6/23/25 final passed | |
| 06/23/2025 | COT - RSPL - Plumbing Final | Passed | 6/23/25 final passed | |
| 06/23/2025 | ENGR Engineering Final | Passed | Site is safe and clean. Everything is in accordance with approved plans. CofO ready. | |
| 06/23/2025 | RSBU - Building Final | Passed | 6/23/25 final passed | |
| 06/23/2025 | RSBU - Building Progress | Passed | 6/23/25 final passed |