Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/08/2023
Applicant:
Craig Morczynski
Description:
SFR LENNLE4001 T22-M0045

Permit Reviews

Permit Number - TC-MDP-0323-00754
Permit Status: Inspections complete
Permit Description: SFR LENNLE4001 T22-M0045
Start Date Submittal Complete Date Status  
09/08/2023 ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 09/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0323-00754
Permit Status: Inspections complete
Permit Description: SFR LENNLE4001 T22-M0045
Total Outstanding Activity Conditions - 6
Date Name
07/14/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/08/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/08/2023 Post-Installed Anchor Inspection Report is required.
09/08/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/11/2023 Post-Tension Inspection Report is required.
09/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0323-00754
Permit Status: Inspections complete
Permit Description: SFR LENNLE4001 T22-M0045
Date Description Comments
09/15/2023 The Contractor you have added to your permit cannot be verified. Please contact staff to have the ROC number added to the account.
03/16/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/14/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00754
Permite Description: SFR LENNLE4001 T22-M0045
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
12/08/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required missing lateral bracing truss A06 A05, loose anchors bolts. Tighten all anchor bolts throughout.
12/01/2023 COT - RSBU - Interior Shear Bracing N/A Not Ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0323-00754
Permit Description: SFR LENNLE4001 T22-M0045
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/24/2023 COT - RSPL - Rough Soil Passed
10/24/2023 COT - RSPL - Sewer Passed
10/24/2023 COT - RSPL - Yard Water Line Passed
11/02/2023 COT - RSBU - Excavation/Rebar/Zoning Passed Missing #5 rebar top and bottom at front of house.
11/02/2023 COT - RSBU - Preslab Passed Missing #5 rebar top and bottom at front of house.
11/02/2023 COT - RSEL - Electrical Underground Passed
11/02/2023 COT - RSEL - Grounding/Bonding Passed
12/01/2023 COT - RSBU - Roof Nailing Passed
12/28/2023 COT - RSBU - Exterior Clips/Sheathing Passed
02/13/2024 COT - RSPL - Gas Pressure Test Passed
02/13/2024 RSBU - Building Progress Passed
02/13/2024 BULD - Electrical Clearance Passed
02/28/2024 COT - RSBU - Interior Shear Bracing Passed
04/26/2024 COT - BULD - SWG Clearance Passed
05/15/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/15/2024 COT - RSEL - Electrical Final Passed
05/15/2024 COT - RSEL - Outdoor Lighting Passed
05/15/2024 COT - RSME - Mechanical Final Passed
05/15/2024 COT - RSPL - Plumbing Final Passed
05/14/2024 ENGR Engineering Final Passed
05/15/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LE II HOMESITE 26 APP_V1.PDF DOCUMENTS VIEW
LE II HOMESITE 26 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LE II HOMESITE 26 SIC-2023-09-08_V1.PDF DOCUMENTS VIEW