Permit: TC-MDP-0323-00723
Permit Details
Apply Date:
01/17/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037
Permit Reviews
Permit Number - TC-MDP-0323-00723
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/16/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.1 | 03/21/2023 | REQUIRES RESUBMIT |
| 04/11/2023 | ZZZMODEL PERMIT REVIEW RESIDENTIAL v.2 | 04/20/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0323-00723
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
| Date | Description | Comments |
|---|---|---|
| 03/22/2023 | A final elevation certificate of the final construction is required before final inspection | |
| 03/22/2023 | An intermediate elevation certificate of the formed pre-slab is required before the pre-slab inspection | |
| 03/16/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 03/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00723
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/12/2023 | COT - RSPL - Rough Soil | Passed | ||
| 05/12/2023 | COT - RSPL - Sewer | Passed | ||
| 05/12/2023 | COT - RSPL - Yard Water Line | Passed | ||
| 05/16/2023 | COT - RSBU - Preslab | Passed | ||
| 05/16/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 06/05/2023 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/05/2023 | COT - RSBU - Roof Nailing | Passed | ||
| 06/07/2023 | BULD - Electrical Clearance | Passed | Electrical rough-in complete new panels installed for Unit 1 and Unit 2. Okay to energize panels. | |
| 06/07/2023 | COT - RSBU - Interior Shear Bracing | Passed | 6/7/23: 5/8 type X fire wall installed between duplex. | |
| 06/07/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Electrical, mechanical, and plumbing rough-in is complete. Okay to insulate, drywall, tape, and texture interior walls for both units. | |
| 07/18/2023 | COT - RSEL - Electrical Final | Passed | Unit 1 and unit 2 pass | |
| 07/18/2023 | COT - RSEL - Outdoor Lighting | Passed | Unit 1 and unit 2 pass | |
| 07/18/2023 | COT - RSME - Mechanical Final | Passed | Unit 1 and unit 2 pass | |
| 07/18/2023 | COT - RSPL - Plumbing Final | Passed | Unit 1 and unit 2 pass | |
| 07/18/2023 | RSBU - Building Final | Passed | ||
| 07/18/2023 | RSBU - Building Progress | Passed | Unit 1 and unit 2 pass | |
| 07/18/2023 | ENGR Engineering Final | Passed |