Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0323-00670
Permit Details
Apply Date:
12/13/2022
Applicant:
Description:
La Estancia T913 renewal submittal - no changes formerly T19-M0025
Permit Reviews
Permit Number - TC-MDP-0323-00670
Permit Status: Complete
Permit Description: La Estancia T913 renewal submittal - no changes formerly T19-M0025
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/08/2023 | RESIDENTIAL NEW DWELLING v.1 | 03/10/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0323-00670
Permit Status: Complete
Permit Description: La Estancia T913 renewal submittal - no changes formerly T19-M0025
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
03/10/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. |
03/10/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
03/10/2023 | Post-Installed Anchor Inspection Report is required. |
03/10/2023 | Post-Tension Inspection Report is required. |
03/10/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00670
Permite Description: La Estancia T913 renewal submittal - no changes formerly T19-M0025
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/26/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6-15-23: 1-B vent for water heater needs 1" clearance from combustibles. 2-No test on gas piping. 3-Seal all fire blocking. 4-Staples missing for electrical. 5-apex piping is less than 12" from recessed cans; move or verify IC rating of cans. Inspection stopped; walk for compliance before rescheduling inspection. 6/26/23: seal penetrations through top and bottom plates at second floor, fireblock duct work going through ceiling, staple missing on romex at laundry, dwv not under test, seal penetrations at top plates in chases under stairs. |
06/15/2023 | COT - RSME - Mechanical Final | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0323-00670
Permit Description: La Estancia T913 renewal submittal - no changes formerly T19-M0025
Total Completed Inspections - 19