Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Partial Pass

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Permit Number - TC-MDP-0323-00670

Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Inspection Status - Partial Pass

Date Description Inspector Results Comments
COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Partial Pass 6-15-23: 1-B vent for water heater needs 1" clearance from combustibles. 2-No test on gas piping. 3-Seal all fire blocking. 4-Staples missing for electrical. 5-apex piping is less than 12" from recessed cans; move or verify IC rating of cans.
Inspection stopped; walk for compliance before rescheduling inspection.
06/26/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 6-15-23: 1-B vent for water heater needs 1" clearance from combustibles. 2-No test on gas piping. 3-Seal all fire blocking. 4-Staples missing for electrical. 5-apex piping is less than 12" from recessed cans; move or verify IC rating of cans.
Inspection stopped; walk for compliance before rescheduling inspection.

6/26/23: seal penetrations through top and bottom plates at second floor, fireblock duct work going through ceiling, staple missing on romex at laundry, dwv not under test, seal penetrations at top plates in chases under stairs.
06/28/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 6-15-23: 1-B vent for water heater needs 1" clearance from combustibles. 2-No test on gas piping. 3-Seal all fire blocking. 4-Staples missing for electrical. 5-apex piping is less than 12" from recessed cans; move or verify IC rating of cans.
Inspection stopped; walk for compliance before rescheduling inspection.

6/26/23: seal penetrations through top and bottom plates at second floor, fireblock duct work going through ceiling, staple missing on romex at laundry, dwv not under test, seal penetrations at top plates in chases under stairs.

6/28/23 seal fire blocking second floor around duct work
06/30/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed