Permit: TC-MDP-0226-00061
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
408 W COLUMBIA ST
Address NEW:
408 W COLUMBIA ST
Apply Date:
02/11/2026
Applicant:
Description:
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Permit Reviews
Permit Number - TC-MDP-0226-00061
Permit Status: Complete
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/12/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 02/27/2026 | REQUIRES RESUBMIT |
| 03/04/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 03/06/2026 | APPROVED |
| 03/12/2026 | SPECIAL INSPECTION REVIEW v.1 | 03/12/2026 | APPROVED |
| 05/01/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/04/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0226-00061
Permit Status: Complete
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Date | Description | Comments |
|---|---|---|
| 02/11/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 02/11/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/11/2026 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 02/11/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0226-00061
Permite Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Outstanding Inspections - 8
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2026 | COT - BULD - SWG Clearance | N/A | Not Applicable | 3-23-26: not applicable. |
| 03/23/2026 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | 3-23-26: not applicable. |
| 04/29/2026 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 4-29-26: no water pressure, missing address numbers at exterior of home, missing anti tip device at stove, all kitchen breakers must be arch fault/gfci, paint pvc on roof top and seal penetration at exterior wall where pressure relief valve extends through stucco, The interior shear wall inspection was never inspected nor approved. Therefore, a "magnet" test must be performed so that drywall screw spacing can be verified. |
| 04/29/2026 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 4-29-26: no water pressure, missing address numbers at exterior of home, missing anti tip device at stove, all kitchen breakers must be arch fault/gfci, paint pvc on roof top and seal penetration at exterior wall where pressure relief valve extends through stucco, The interior shear wall inspection was never inspected nor approved. Therefore, a "magnet" test must be performed so that drywall screw spacing can be verified. |
| 04/29/2026 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 4-29-26: no water pressure, missing address numbers at exterior of home, missing anti tip device at stove, all kitchen breakers must be arch fault/gfci, paint pvc on roof top and seal penetration at exterior wall where pressure relief valve extends through stucco, The interior shear wall inspection was never inspected nor approved. Therefore, a "magnet" test must be performed so that drywall screw spacing can be verified. |
| 04/29/2026 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 4-29-26: no water pressure, missing address numbers at exterior of home, missing anti tip device at stove, all kitchen breakers must be arch fault/gfci, paint pvc on roof top and seal penetration at exterior wall where pressure relief valve extends through stucco, The interior shear wall inspection was never inspected nor approved. Therefore, a "magnet" test must be performed so that drywall screw spacing can be verified. |
| 04/29/2026 | ENGR Engineering Final | N/A | Partial Pass | contractor is not finished with the landscaping will call when completed |
| 04/29/2026 | RSBU - Building Final | N/A | Re-inspection required | 4-29-26: no water pressure, missing address numbers at exterior of home, missing anti tip device at stove, all kitchen breakers must be arch fault/gfci, paint pvc on roof top and seal penetration at exterior wall where pressure relief valve extends through stucco, The interior shear wall inspection was never inspected nor approved. Therefore, a "magnet" test must be performed so that drywall screw spacing can be verified. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0226-00061
Permit Description: Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2026 | COT - RSPL - Rough Soil | Passed | ||
| 03/11/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 03/11/2026 | COT - RSPL - Sewer | Passed | ||
| 03/11/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 03/12/2026 | COT - RSBU - Preslab | Passed | 03/12/2026 Approved per site plan and reinforcement detail. Okay to pour concrete. Ufer in place. |
|
| 03/12/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 03/12/2026 Approved per site plan and reinforcement detail. Okay to pour concrete. |
|
| 03/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 03/18/2026 Approved per plan. Verified added nails to panel on west side as marked where nails are closer than 3/8" to panel edge. |
|
| 03/23/2026 | COT - RSEL - Electrical Underground | Passed | 3-23-26: approved. | |
| 03/24/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/24/2026 | COT - RSBU - Roof Nailing | Passed | 3.24.26 Approved |
|
| 03/31/2026 | BULD - Electrical Clearance | Passed | approved for eco | |
| 04/29/2026 | COT - RSEL - Outdoor Lighting | Passed | 4-29-26: approved. | |
| 04/30/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/30/2026 | COT - RSEL - Electrical Final | Passed | 04/30/2026 Corrections made to prior inspection. |
|
| 04/30/2026 | COT - RSME - Mechanical Final | Passed | 04/30/2026 Corrections made to prior inspection. |
|
| 04/30/2026 | COT - RSPL - Plumbing Final | Passed | 04/30/2026 Corrections made to prior inspection. |
|
| 04/30/2026 | ENGR Engineering Final | Passed | ||
| 04/30/2026 | RSBU - Building Progress | Passed | 04/30/2026 Corrections made to prior inspection. |
|
| 04/30/2026 | RSBU - Building Final | Passed | 04/30/2026 Corrections made to prior inspection. |