Inspection History Details
Inspection Status: Partial Pass
Inspection History: RSBU - Building Progress
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2026 | RSBU - Building Progress | Partial Pass | 3.24.26 Approved |
|
| 04/29/2026 | RSBU - Building Progress | Passed | 4-29-26: no water pressure, missing address numbers at exterior of home, missing anti tip device at stove, all kitchen breakers must be arch fault/gfci, paint pvc on roof top and seal penetration at exterior wall where pressure relief valve extends through stucco, The interior shear wall inspection was never inspected nor approved. Therefore, a "magnet" test must be performed so that drywall screw spacing can be verified. 04/30/2026 Corrections made to prior inspection. |
|
| 04/30/2026 | RSBU - Building Progress | Passed | 04/30/2026 Corrections made to prior inspection. |