Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
6219 E CAMPOLINA TR
Apply Date:
02/12/2026
Applicant:
Helen Ormsby
Description:
Blackhawk H30M Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00014)

Permit Reviews

Permit Number - TC-MDP-0226-00059
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00014)
Start Date Submittal Complete Date Status  
06/30/2026 SPECIAL INSPECTION REVIEW v.1 07/01/2026 APPROVED Review Details
02/18/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/27/2026 APPROVED Review Details
08/14/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/17/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0226-00059
Permit Status: Inspections complete
Permit Description: Blackhawk H30M Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00014)
Date Description Comments
02/05/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
02/20/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/05/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/05/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
02/20/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.
02/05/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0226-00059
Permite Description: Blackhawk H30M Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00014)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/18/2026 RSBU - Building Final N/A Partial Pass 8-18-26 building final approved. Partial pass pending threshold at garage door entry.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0226-00059
Permit Description: Blackhawk H30M Model Plan (2024 IRC) (Model Master Plan TC-MDP-0126-00014)
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/15/2026 COT - RSPL - Yard Water Line Passed 5.15.26
Approved
05/15/2026 COT - RSPL - Rough Soil Passed 5.15.26
Approved
05/15/2026 COT - RSPL - Sewer Passed
05/21/2026 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 5/21/26
05/21/2026 COT - RSEL - Electrical Underground Passed Passed 5/21/26
05/21/2026 BULD - Electrical Clearance Passed Passed 5/21/26
05/21/2026 COT - RSBU - Preslab Passed Passed 5/21/26
06/05/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
06/05/2026 COT - RSBU - Roof Nailing Passed
06/23/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/23/2026 COT - RSPL - Gas Pressure Test Passed
08/06/2026 COT - BULD - SWG Clearance Passed 8-6-26: okay to install gas meter-SWG Clearance issued.
08/18/2026 COT - RSEL - Electrical Final Passed 8-18-26. Electrical final approved.
08/18/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
08/18/2026 COT - RSEL - Outdoor Lighting Passed
08/18/2026 COT - RSME - Mechanical Final Passed 8-18-26 mechanical final approved.
08/18/2026 COT - RSPL - Plumbing Final Passed 8-18-26 plumbing final approved
08/18/2026 RSBU - Building Progress Passed
08/18/2026 COT - RSBU - Interior Shear Bracing Passed 8-18-26 okay to cover
08/19/2026 RSBU - Building Final Passed