Permit: TC-MDP-0225-00144
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
408 W PRESIDENT ST
Address NEW:
408 W PRESIDENT ST
Apply Date:
02/14/2025
Applicant:
Carlos Brown
Description:
REV1: Setback revision per the inspector’s request at 22’ in the front and 20’ rear Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Permit Reviews
Permit Number - TC-MDP-0225-00144
Permit Status: Complete
Permit Description: REV1: Setback revision per the inspector’s request at 22’ in the front and 20’ rear
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/09/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/10/2026 | APPROVED |
| 03/17/2026 | SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 | 03/19/2026 | APPROVED |
| 02/14/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 03/10/2025 | REQUIRES RESUBMIT |
| 06/23/2025 | RESTAMP - RESIDENTIAL v.1 | 06/24/2025 | REQUIRES RESUBMIT |
| 03/21/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 04/22/2025 | REQUIRES RESUBMIT |
| 08/14/2025 | RESTAMP - RESIDENTIAL v.2 | 08/14/2025 | APPROVED |
| 05/06/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 06/05/2025 | REQUIRES RESUBMIT |
| 06/20/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.4 | 06/23/2025 | APPROVED |
| 07/07/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 07/22/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0225-00144
Permit Status: Complete
Permit Description: REV1: Setback revision per the inspector’s request at 22’ in the front and 20’ rear
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
| Date | Description | Comments |
|---|---|---|
| 02/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 06/23/2025 | A ROW permit shall be obtained from the City of Tucson Department of Transportation and Mobility (DTM) prior to any work within the Public Right-of-Way. New construction in the public Right-of-Way shall be in conformance with the current edition of Pima Association of Governments (PAG) Standard Specifications and Details for public improvements. Visit https://apps.pagregion.com/standardspecifications/ for PAG standards and specifications. | |
| 02/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00144
Permite Description: REV1: Setback revision per the inspector’s request at 22’ in the front and 20’ rear
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | COT - RSPL - Rough Soil | N/A | Re-inspection required | 8-21-25: plumbing layout not per plan-submit revision or install per plans. Greywater missing at time of inspection. Note: In the event that underground plumbing fails again (3 times), a reinspection fee will be added. |
| 09/03/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | |
| 09/03/2025 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | |
| 03/23/2026 | RSBU - Building Final | N/A | Re-inspection required | 3-23-26: open knockout at panel, add R3 insulation to hot water side of water heater, missing vacuum breaker at front hose bib, receptacle at east wall of living room measured at 12' 7"-max spacing is 12'. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00144
Permit Description: REV1: Setback revision per the inspector’s request at 22’ in the front and 20’ rear
Carlos MP 1440 SFR (Model master plan TC-MDP-0823-01449)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2025 | COT - RSPL - Sewer | Passed | 8-21-25: sewer connection approved. | |
| 08/21/2025 | COT - RSPL - Backwater Valve | Passed | 8-21-25: backwater valve approved. | |
| 08/25/2025 | COT - RSPL - Rough Soil | Passed | Waste lines and sewer line connection. Ok to cover progress areas. | |
| 09/03/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 09/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9-8-25: corrections made -exterior clips/sheathing approved. | |
| 09/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 9-9-25: intermediates approved. Okay to continue with construction. | |
| 09/15/2025 | BULD - Electrical Clearance | Passed | TEP CLEARANCE: INCR | |
| 09/22/2025 | COT - RSEL - Electrical Underground | Passed | 9-22-25: electrical underground approved. Okay to backfill with shading materials. | |
| 09/23/2025 | COT - RSPL - Yard Water Line | Passed | 9.23.2025 Verified depth, tracer wire, under test. Add vacuum breaker at hose bibb. Okay to backfill, shading materials required. |
|
| 03/23/2026 | ENGR Engineering Final | Passed | ||
| 03/23/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 3-23-26: revision submitted & approved. | |
| 03/23/2026 | COT - RSBU - Preslab | Passed | 3-23-26: revision submitted & approved. | |
| 03/23/2026 | COT - RSEL - Grounding/Bonding | Passed | 3-23-26: approved. | |
| 03/23/2026 | COT - RSEL - Outdoor Lighting | Passed | 3-23-26: approved. | |
| 03/24/2026 | COT - RSEL - Electrical Final | Passed | 3.24.26 Approved |
|
| 03/24/2026 | COT - RSME - Mechanical Final | Passed | 3.24.26 Approved |
|
| 03/24/2026 | COT - RSPL - Plumbing Final | Passed | 3.24.26 Approved |
|
| 03/25/2026 | RSBU - Building Final | Passed |