Permit: TC-MDP-0225-00138
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12776 E TORTOISE POINTE DR
Address NEW:
12776 E TORTOISE POINTE DR
Apply Date:
02/13/2025
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Permit Reviews
Permit Number - TC-MDP-0225-00138
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/11/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/01/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00138
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 02/14/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0225-00138
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
| Date | Description | Comments |
|---|---|---|
| 02/14/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/14/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00138
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4) (Model master plan TC-MDP-1222-00031)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/09/2025 | COT - RSPL - Rough Soil | Passed | 4-9-25, main water line, sewer connection, and underground plumbing per approved plans. Okay to backfill with shading materials | |
| 04/09/2025 | COT - RSPL - Sewer | Passed | 4-9-25, main water line, sewer connection, and underground plumbing per approved plans. Okay to backfill with shading materials | |
| 04/09/2025 | COT - RSPL - Yard Water Line | Passed | 4-9-25, main water line, sewer connection, and underground plumbing per approved plans. Okay to backfill with shading materials | |
| 04/18/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 04/18/2025 | COT - RSBU - Preslab | Passed | ||
| 04/18/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 05/08/2025 | COT - RSBU - Roof Nailing | Passed | 5/8/25 corrections made | |
| 05/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5/8/25 corrections made | |
| 05/28/2025 | BULD - Electrical Clearance | Passed | 5-28-25, panel okay to be energized. ECO clearance issued to TEP. | |
| 05/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5-28-25, intermediates approved. Okay to continue with construction. | |
| 05/28/2025 | COT - RSEL - Grounding/Bonding | Passed | 5-28-25, grounding/bonding approved. | |
| 05/28/2025 | COT - RSPL - Gas Pressure Test | Passed | 5-28-25, gas pressure test | |
| 06/11/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 6/11/25 ok to tape | |
| 07/25/2025 | COT - BULD - SWG Clearance | Passed | 7/25/25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 08/08/2025 | COT - RSEL - Electrical Final | Passed | 8.8.25 Approved |
|
| 08/08/2025 | COT - RSEL - Outdoor Lighting | Passed | 8.8.25 Approved |
|
| 08/08/2025 | COT - RSME - Mechanical Final | Passed | 8.8.25 Approved |
|
| 08/08/2025 | COT - RSPL - Plumbing Final | Passed | 8.8.25 Approved |
|
| 08/08/2025 | ENGR Engineering Final | Passed | ||
| 08/08/2025 | RSBU - Building Final | Passed | ||
| 08/08/2025 | RSBU - Building Progress | Passed | 8.8.25 Approved |