Permit: TC-MDP-0225-00120
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5941 E JAYDEN LN
Address NEW:
5941 E JAYDEN LN
Apply Date:
02/05/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Permit Reviews
Permit Number - TC-MDP-0225-00120
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/28/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/07/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00120
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 04/03/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 04/03/2025 | Post-Installed Anchor Inspection Report is required. |
| 04/03/2025 | Post-Tension Inspection Report is required. |
| 04/03/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0225-00120
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
| Date | Description | Comments |
|---|---|---|
| 02/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00120
Permite Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 6-11-25: spacing not per plans for shear wall at garage and shear wall behind garage-nails cannot be closer than 3/8" from edges/joints and can't over penetrate more than 1/8"Check spacing at exterior shear panel nailing and add nails at marked locations due to either missing and or over penetrated nailing-not all panels were marked do have framer wall it in its entirety.Missing 2 HTT4's at entry to foyer, missing A-35's at base of staircase, loose shear wall upstairs east side, southeast wall miss nails at sill plate to decking. STOPPED INSPECTION-ADDITIONAL ITEMS MAY BE ADDED. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00120
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/19/2025 | COT - RSPL - Rough Soil | Passed | 5/19/25 Ok to backfill, shading required. |
|
| 05/19/2025 | COT - RSPL - Sewer | Passed | 5/19/25 Ok to backfill, shading required. |
|
| 05/19/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 05/27/2025 | COT - RSEL - Electrical Underground | Passed | 5-27-25, electrical underground approved. | |
| 05/27/2025 | COT - RSBU - Preslab | Passed | 5-27-25, preslab,excavation/reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 05/27/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5-27-25, excavation/reinforcement and setbacks verified per plans. Okay to pour concrete. | |
| 05/27/2025 | BULD - Electrical Clearance | Passed | 5-27-25, panel is okay to be energized. ECO clearance issued to TEP. | |
| 06/11/2025 | COT - RSBU - Roof Nailing | Passed | 6-11-25: roof nailing approved. Okay to dry-in | |
| 06/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 6-13-25: exterior clips/sheathing approved. | |
| 06/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 06/25/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 06/25/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 07/11/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7.11.25 Shear walls fastened per schedule. General fastener patterns verified as well. No railroading, depth and spacing good. Passed. |
|
| 08/14/2025 | COT - BULD - SWG Clearance | Passed | Southwest Gas Clearance: SWG | |
| 08/21/2025 | COT - RSEL - Electrical Final | Passed | 8.21.25 Approved |
|
| 08/21/2025 | COT - RSEL - Outdoor Lighting | Passed | 8.21.25 Approved |
|
| 08/21/2025 | COT - RSME - Mechanical Final | Passed | 8.21.25 Approved |
|
| 08/21/2025 | COT - RSPL - Plumbing Final | Passed | 8.21.25 Approved |
|
| 08/21/2025 | RSBU - Building Final | Passed | 8.21.25 Approved |
|
| 08/21/2025 | RSBU - Building Progress | Passed | 8.21.25 APPROVED |
|
| 09/03/2025 | ENGR Engineering Final | Passed | CO Ready |