Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address:
9504 E MEOLA DR
Address NEW:
9504 E MEOLA DR
Apply Date:
04/16/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)

Permit Reviews

Permit Number - TC-MDP-0225-00096
Permit Status: Inspections complete
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Start Date Submittal Complete Date Status  
05/05/2025 RESTAMP - RESIDENTIAL v.1 05/08/2025 APPROVED Review Details
05/02/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 05/05/2025 APPROVED Review Details
04/17/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/24/2025 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00096
Permit Status: Inspections complete
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Total Outstanding Activity Conditions - 5
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/05/2025 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/05/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/05/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Conditions

Permit Number - TC-MDP-0225-00096
Permit Status: Inspections complete
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Date Description Comments
04/17/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
05/05/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00096
Permite Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/15/2025 COT - BULD - SWG Clearance N/A Not Applicable N/A

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00096
Permit Description: Mirador Point 1842 Plan (Model master plan TC-MDP-0125-00032)
Total Completed Inspections - 20
Date Description Inspector Results Comments
05/15/2025 COT - RSPL - Gas Pressure Test Passed
05/15/2025 COT - RSPL - Rough Soil Passed
05/15/2025 COT - RSPL - Sewer Passed
05/15/2025 COT - RSPL - Yard Water Line Passed
05/22/2025 COT - RSEL - Electrical Underground Passed Passed 5/22/25 ok to pour concrete
05/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 5/22/25 ok to pour concrete
05/22/2025 COT - RSBU - Preslab Passed Passed 5/22/25 ok to pour concrete
06/25/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 6/25/25 corrections made
06/25/2025 COT - RSBU - Roof Nailing Passed 6/25/25 corrections made
07/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 7/16/25 corrections made
07/23/2025 COT - RSBU - Interior Shear Bracing Passed
07/25/2025 BULD - Electrical Clearance Passed 7/25/25
TEP CLEARANCE: ECO
07/25/2025 COT - RSEL - Grounding/Bonding Passed
09/02/2025 COT - RSEL - Outdoor Lighting Passed
09/02/2025 COT - RSPL - Plumbing Final Passed
09/02/2025 ENGR Engineering Final Passed CO Ready
09/02/2025 RSBU - Building Progress Passed
09/05/2025 COT - RSEL - Electrical Final Passed 9.5.2025
Corrections made.
09/05/2025 COT - RSME - Mechanical Final Passed 9.5.2025
Corrections made.
09/05/2025 RSBU - Building Final Passed 9.5.2025
Corrections made.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 124 START_V2.PDF DOCUMENTS VIEW
MP 124 SIC-2025-04-29_V2.PDF DOCUMENTS VIEW