Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0225-00092
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
9551 E WYNALDA DR
Address NEW:
9551 E WYNALDA DR
Apply Date:
08/18/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Permit Reviews
Permit Number - TC-MDP-0225-00092
Permit Status: Inspections
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/20/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/27/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0225-00092
Permit Status: Inspections
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 02/07/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 08/20/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/20/2025 | Post-Installed Anchor Inspection Report is required. |
| 08/20/2025 | SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED. |
| 08/20/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0225-00092
Permit Status: Inspections
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
| Date | Description | Comments |
|---|---|---|
| 02/07/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/07/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0225-00092
Permite Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Ready | Add A35 and H25 clip at back patio East end. Add shot pins and anchor bolt at marked areas. Add king stud at primary shower window. Add bracing to truss A1E. Add 2 nails every 24” at ledger in bedroom 3. Add shims and H25 clips at truss A3 bearing points. (At entry) 10/9/2025 |
| 10/21/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 10/28/2025 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | Shear wall not per schedule, thermostat not at 48" |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0225-00092
Permit Description: Mirador Point 1584 Plan (Model master plan TC-MDP-0125-00031)
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/19/2025 | COT - RSPL - Rough Soil | Passed | 9.19.2025 Okay to backfill, shading required. |
|
| 09/19/2025 | COT - RSPL - Sewer | Passed | 9.19.2025 Okay to backfill, shading required. |
|
| 09/19/2025 | COT - RSPL - Yard Water Line | Passed | 9.19.2025 Okay to backfill, shading required. |
|
| 09/30/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.30.25 approved |
|
| 09/30/2025 | COT - RSBU - Preslab | Passed | 9.30.25 approved |
|
| 09/30/2025 | COT - RSEL - Electrical Underground | Passed | 9.30.25 Passed |
|
| 09/30/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/09/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.10.25 corrections made |
|
| 10/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.21.2025 Approved, added FHA plate at sill plate & braced water lines behind shower and sealed penetrations at marked areas. Verified 19 home run circuits per updated panel schedule. |
|
| 10/21/2025 | BULD - Electrical Clearance | Passed | 10.21.2025 Clearance to TEP ECO. |