Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7388 S DEMPSEY AV
Apply Date:
02/04/2025
Applicant:
Celina Rodriguez
Description:
Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)

Permit Reviews

Permit Number - TC-MDP-0225-00085
Permit Status: Inspections complete
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Start Date Submittal Complete Date Status  
02/27/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0225-00085
Permit Status: Inspections complete
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Total Outstanding Activity Conditions - 6
Date Name
02/07/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/05/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/05/2025 Post-Installed Anchor Inspection Report is required.
03/05/2025 Post-Tension Inspection Report is required.
03/05/2025 Soil Compaction Special Inspection is Required.

Conditions

Permit Number - TC-MDP-0225-00085
Permit Status: Inspections complete
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Date Description Comments
02/07/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
02/07/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00085
Permite Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/26/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 26 March 25
Partial pass for UFER.
04/23/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
04/23/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable Site does not use gas

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0225-00085
Permit Description: Mirador Point 1512 Plan (Model master plan TC-MDP-0125-00030)
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/19/2025 COT - RSPL - Rough Soil Passed Passed 3/19/25 ok to backfill
03/19/2025 COT - RSPL - Sewer Passed Passed 3/19/25 ok to backfill
03/19/2025 COT - RSPL - Yard Water Line Passed Passed 3/19/25 ok to backfill
03/26/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
03/26/2025 COT - RSBU - Preslab Passed
03/26/2025 COT - RSEL - Electrical Underground Passed
04/17/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/17/2025 COT - RSBU - Roof Nailing Passed
04/23/2025 BULD - Electrical Clearance Passed Passed 4/23/25 CLEARANCE ECO
04/23/2025 COT - RSEL - Grounding/Bonding Passed Passed 4/23/25
04/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/07/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/7/25
07/29/2025 COT - RSEL - Outdoor Lighting Passed
07/29/2025 RSBU - Building Progress Passed
07/30/2025 COT - RSEL - Electrical Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSME - Mechanical Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 COT - RSPL - Plumbing Final Passed Approved. All corrections were made. 7/30/2025
07/30/2025 RSBU - Building Final Passed Approved. All corrections were made. 7/30/2025
08/28/2025 ENGR Engineering Final Passed CO Ready

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 12 START_V1.PDF DOCUMENTS VIEW
MP 12 SIC-2025-02-25_V1.PDF DOCUMENTS VIEW