Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/29/2025 | ENGR Engineering Final | Not Ready | Dumpster blocking driveway. | |
| 08/27/2025 | ENGR Engineering Final | Failed | Nursery stake needs to be removed and tree needs to be properly staked. Clean out needs to be cut down and collar needs to be glued in place. |
|
| 08/28/2025 | ENGR Engineering Final | Passed | CO Ready |