Permit: TC-MDP-0225-00080
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6764 E PASEO DON OCTAVIO
Address NEW:
6764 E PASEO DON OCTAVIO
Apply Date:
05/05/2025
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Permit Reviews
Permit Number - TC-MDP-0225-00080
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/23/2025 | APPROVED |
| 05/08/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 05/19/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0225-00080
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
| Date | Description | Comments |
|---|---|---|
| 02/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 05/09/2025 | Post-Installed Anchor Inspection Report is required. | |
| 05/09/2025 | Post-Tension Inspection Report is required. | |
| 02/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00080
Permit Description: Single Family Residence Plan 130.1600 (Model master plan TC-MDP-0924-00985)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2025 | COT - RSPL - Rough Soil | Passed | 9.9.25 Trench conditions remedied Site is in accordance with plans APPROVED, PROCEED |
|
| 09/09/2025 | COT - RSPL - Sewer | Passed | 9.9.25 Trench conditions remedied Site is in accordance with plans APPROVED, PROCEED |
|
| 09/09/2025 | COT - RSPL - Yard Water Line | Passed | 9.9.25 Trench conditions remedied Site is in accordance with plans APPROVED, PROCEED |
|
| 09/16/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.16.25 APPROVED OK TO POUR |
|
| 09/16/2025 | COT - RSBU - Preslab | Passed | 9.16.25 APPROVED |
|
| 09/16/2025 | COT - RSEL - Electrical Underground | Passed | 9.16.25 APPROVED OK TO POUR |
|
| 09/22/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 09/22/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 09/30/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/01/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/01/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/10/2025 | BULD - Electrical Clearance | Passed | ||
| 10/10/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/12/2025 | COT - BULD - SWG Clearance | Passed | 11/10/25: SWG Clearance | |
| 11/20/2025 | COT - RSEL - Electrical Final | Passed | ||
| 11/20/2025 | COT - RSME - Mechanical Final | Passed | ||
| 11/20/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/20/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/20/2025 | RSBU - Building Final | Passed | ||
| 11/20/2025 | RSBU - Building Progress | Passed | ||
| 11/24/2025 | ENGR Engineering Final | Passed |