Inspection History Details
Inspection Status: Re-inspection required
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/30/2025 | BULD - Electrical Clearance | Re-inspection required | 9/30/25: pull-string from transformer at riser required for TEP clearance | |
| 10/10/2025 | BULD - Electrical Clearance | Passed |