Permit: TC-MDP-0225-00069
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
2620 S BRANDYWINE LN
Address NEW:
2620 S BRANDYWINE LN
Apply Date:
02/03/2025
Applicant:
Chris Irby
Description:
1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Permit Reviews
Permit Number - TC-MDP-0225-00069
Permit Status: Complete
Permit Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 02/14/2025 | APPROVED |
| 09/24/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/24/2025 | REQUIRES RESUBMIT |
| 10/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/05/2025 | APPROVED |
| 08/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/07/2025 | APPROVED |
| 05/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/16/2025 | REQUIRES RESUBMIT |
| 07/16/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/16/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0225-00069
Permit Status: Complete
Permit Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
| Date | Description | Comments |
|---|---|---|
| 02/06/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 02/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 02/06/2025 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 02/06/2025 | Post-Tension Inspection Report is required. | |
| 02/03/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 02/03/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 02/06/2025 | Soil Compaction Special Inspection is Required. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0225-00069
Permit Description: 1453T Ireland We have purchased this plan/property from Cornerstone Homes and would like to permit from previously approved plan. (Model master plan TC-MDP-0125-00009)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2025 | BULD - Electrical Clearance | Passed | 3 April 25 TEP CLEARANCE: ECO |
|
| 04/03/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 04/09/2025 | COT - RSPL - Rough Soil | Passed | 4-9-25, Underground plumbing per plan. Sewer and main water line in same trench-contractor advised a 12" clearance is required between each. Contractor will be onsite while backfilling and was advised to take photos of required clearance | |
| 04/09/2025 | COT - RSPL - Sewer | Passed | 4-9-25, sewer, main water line, &Underground plumbing per plan. Sewer and main water line in same trench-contractor advised a 12" clearance is required between each. Contractor will be onsite while backfilling and was advised to take photos of required clearance | |
| 04/17/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 4/17/25 ok to pour concrete | |
| 04/17/2025 | COT - RSBU - Preslab | Passed | Passed 4/17/25 ok to pour concrete | |
| 04/17/2025 | COT - RSEL - Electrical Underground | Passed | Passed 4/17/25 ok to pour concrete | |
| 04/29/2025 | COT - RSBU - Roof Nailing | Passed | Passed 4/29/25 | |
| 04/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 4/29/25 | |
| 05/13/2025 | COT - RSEL - Grounding/Bonding | Passed | Ground rods connected with proper spacing | |
| 05/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 5/13/25 ok to cover | |
| 05/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 5/22/25 ok to tape | |
| 06/11/2025 | COT - BULD - SWG Clearance | Passed | Passed clearance SWG 6/11/25 | |
| 06/13/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure | |
| 06/16/2025 | COT - RSME - Mechanical Final | Passed | Passed final 6/16/25 | |
| 06/16/2025 | RSBU - Building Final | Passed | Passed final 6/16/25 | |
| 06/16/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 06/16/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 6/16/25 | |
| 06/16/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 6/16/25 | |
| 06/16/2025 | RSBU - Building Progress | Passed | Passed final 6/16/25 | |
| 06/16/2025 | COT - RSEL - Electrical Final | Passed | Passed final 6/16/25 |