Permit: TC-MDP-0225-00069

Parcel: 136130630

Inspection Status: Re-inspection required

Inspection History: COT - RSPL - Rough Soil 

Date Description Inspector Results Comments
04/03/2025 COT - RSPL - Rough Soil  Re-inspection required 3 April 25
1. Plumbing not per plan, DWV is on the wrong side of the house and too close to water line. DWV needs to be relocated to south side of house.
04/09/2025 COT - RSPL - Rough Soil  Passed 4-9-25, Underground plumbing per plan. Sewer and main water line in same trench-contractor advised a 12" clearance is required between each. Contractor will be onsite while backfilling and was advised to take photos of required clearance