Apply Date:
02/28/2024
Applicant:
Paul Schmidt
Description:
SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Permit Reviews
Permit Number - TC-MDP-0224-00259
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00259
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
02/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
02/27/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/15/2024 | Post-Installed Anchor Inspection Report is required. |
03/15/2024 | Post-Tension Inspection Report is required. |
03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0224-00259
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Date | Description | Comments |
---|---|---|
02/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00259
Permite Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/04/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 10/4/24: cut clean outs to grade and UV coat, exterior plastic piping must be UV Coated, post tension tag required at hose bib, AC units are being over amped, please provide approved plans at final, b-vent at water heater requires tape at single wall pipe, listing at garage must be clear, light fixtures missing throughout house. No ladder for attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
10/04/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 10/4/24: cut clean outs to grade and UV coat, exterior plastic piping must be UV Coated, post tension tag required at hose bib, AC units are being over amped, please provide approved plans at final, b-vent at water heater requires tape at single wall pipe, listing at garage must be clear, light fixtures missing throughout house. No ladder for attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
10/04/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 10/4/24: cut clean outs to grade and UV coat, exterior plastic piping must be UV Coated, post tension tag required at hose bib, AC units are being over amped, please provide approved plans at final, b-vent at water heater requires tape at single wall pipe, listing at garage must be clear, light fixtures missing throughout house. No ladder for attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
10/04/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 10/4/24: cut clean outs to grade and UV coat, exterior plastic piping must be UV Coated, post tension tag required at hose bib, AC units are being over amped, please provide approved plans at final, b-vent at water heater requires tape at single wall pipe, listing at garage must be clear, light fixtures missing throughout house. No ladder for attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
10/04/2024 | RSBU - Building Final | N/A | Re-inspection required | 10/4/24: cut clean outs to grade and UV coat, exterior plastic piping must be UV Coated, post tension tag required at hose bib, AC units are being over amped, please provide approved plans at final, b-vent at water heater requires tape at single wall pipe, listing at garage must be clear, light fixtures missing throughout house. No ladder for attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
10/04/2024 | RSBU - Building Progress | N/A | Re-inspection required | 10/4/24: cut clean outs to grade and UV coat, exterior plastic piping must be UV Coated, post tension tag required at hose bib, AC units are being over amped, please provide approved plans at final, b-vent at water heater requires tape at single wall pipe, listing at garage must be clear, light fixtures missing throughout house. No ladder for attic access.STOPPED INSPECTION MORE ITEMS MAY BE ADDED |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00259
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Completed Inspections - 23
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/23/2024 | COT - RSPL - Rough Soil | Passed | ||
04/23/2024 | COT - RSPL - Sewer | Passed | ||
04/23/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/01/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed and spaced, required rebar reinforcement is in place per plans, all plumbing pipes are properly wrapped for protection, underground electrical for kitchen island and floor outlet in great room is installed, Ufer ground rebar is installed. Okay to pour concrete for footings and slab. | |
05/01/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed and spaced, required rebar reinforcement is in place per plans, all plumbing pipes are properly wrapped for protection, underground electrical for kitchen island and floor outlet in great room is installed, Ufer ground rebar is installed. Okay to pour concrete for footings and slab. | |
05/01/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly installed and spaced, required rebar reinforcement is in place per plans, all plumbing pipes are properly wrapped for protection, underground electrical for kitchen island and floor outlet in great room is installed, Ufer ground rebar is installed. Okay to pour concrete for footings and slab. | |
05/01/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed and spaced, required rebar reinforcement is in place per plans, all plumbing pipes are properly wrapped for protection, underground electrical for kitchen island and floor outlet in great room is installed, Ufer ground rebar is installed. Okay to pour concrete for footings and slab. | |
05/01/2024 | COT - RSPL - Backwater Valve | Passed | Backwater valve is installed between clean outs. Okay to proceed. | |
06/03/2024 | COT - RSBU - Roof Nailing | Passed | ||
06/04/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/11/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/12/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 7/12/24: All rips, tears, and holes in vapor barrier have been sealed with foam or caulking. Okay to proceed with insulation and drywall installation. | |
07/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly installed and secured to the studs per plan requirements. Okay to proceed with drywall tape, texture, and paint. | |
09/19/2024 | COT - BULD - SWG Clearance | Passed | SWG for meter connection | |
09/20/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
10/04/2024 | COT - FCON - Sprinkler - Final | Passed | ||
10/04/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/11/2024 | COT - RSEL - Electrical Final | Passed | 10/11/24: All noted items have been corrected. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | COT - RSME - Mechanical Final | Passed | 10/11/24: All noted items have been corrected. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | COT - RSPL - Plumbing Final | Passed | 10/11/24: All noted items have been corrected. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | RSBU - Building Final | Passed | 10/11/24: All noted items have been corrected. Construction is complete per plans. Okay to issue Certificate of Occupancy. | |
10/11/2024 | RSBU - Building Progress | Passed | 10/11/24: All noted items have been corrected. Construction is complete per plans. Okay to issue Certificate of Occupancy. |