Permit: TC-MDP-0224-00258
Permit Details
Apply Date:
02/28/2024
Applicant:
Paul Schmidt
Description:
SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Permit Reviews
Permit Number - TC-MDP-0224-00258
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/01/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00258
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Activity Conditions - 7
Date | Name |
---|---|
02/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
02/27/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
03/15/2024 | Post-Installed Anchor Inspection Report is required. |
03/15/2024 | Post-Tension Inspection Report is required. |
03/15/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0224-00258
Permit Status: Inspections complete
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Date | Description | Comments |
---|---|---|
02/27/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00258
Permite Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/07/2024 | COT - RSEL - Electrical Final | N/A | Canceled | 10/7/24: Cancelled by Jay Merrick. Will reschedule for another day. |
10/07/2024 | ENGR Engineering Final | N/A | Partial Pass | Contractor needs to remove construction material from the side of the house |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00258
Permit Description: SFR F40J22 T22-M0022 revision truss calcs (optional GR RM added)
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/29/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing and sewer are complete and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
04/29/2024 | COT - RSPL - Sewer | Passed | Underground plumbing and sewer are complete and under a 10' water test with no leaks. Okay to shade pipes and backfill trenches. | |
04/29/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to the main meter and under street pressure with no leaks. Okay to shade water line and backfill trench. | |
05/10/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam properly. Okay to pour concrete for footings and slab on grade. | |
05/10/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is installed, underground electrical is in place, Ufer ground is in place on side of garage, required shear wall hold downs are in place and connected to rebar reinforcement, masa clips are evenly spaced around outside edge of form, and all underground plumbing pipes are wrapped with foam properly. Okay to pour concrete for footings and slab on grade. | |
06/21/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/19/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/19/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/02/2024 | COT - RSBU - Interior Shear Bracing | Passed | 8/2/24: Plans are onsite. Sheet rock on interior shear walls is properly secured to the studs with screws at the correct spacing per the plan. Okay to proceed with tape, texture, and paint. | |
09/26/2024 | COT - BULD - SWG Clearance | Passed | PASSED SW GAS CLEARANCE 9/26/2024 | |
10/16/2024 | COT - FCON - Sprinkler - Final | Passed | This must be the wrong address there is no 5767 | |
10/16/2024 | COT - RSEL - Electrical Final | Passed | 10/16/24: Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/16/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/16/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/16/2024 | COT - RSPL - Plumbing Final | Passed | 10/16/24: Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/16/2024 | ENGR Engineering Final | Passed | CO Ready | |
10/16/2024 | RSBU - Building Final | Passed | 10/16/24: Construction is completed per plans. Okay to issue Certificate of Occupancy. | |
10/16/2024 | RSBU - Building Progress | Passed | 10/16/24: Construction is completed per plans. Okay to issue Certificate of Occupancy. |