Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
07/08/2024
Applicant:
Ben Smith
Description:
SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension

Permit Reviews

Permit Number - TC-MDP-0224-00224
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Start Date Submittal Complete Date Status  
08/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.4 08/16/2024 REQUIRES RESUBMIT Review Details
08/28/2024 RESTAMP - RESIDENTIAL v.1 08/28/2024 REQUIRES RESUBMIT Review Details
08/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.5 08/28/2024 APPROVED Review Details
08/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.3 08/08/2024 REQUIRES RESUBMIT Review Details
07/11/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 07/12/2024 REQUIRES RESUBMIT Review Details
08/29/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/03/2024 APPROVED Review Details
07/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/09/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00224
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Outstanding Activity Conditions - 6
Date Name
02/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/09/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
07/09/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
07/09/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
07/09/2024 Post-Tension Inspection Report is required.
07/09/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0224-00224
Permit Status: Inspections complete
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Date Description Comments
02/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00224
Permite Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
10/24/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 10-24-24, Add nails throughout second floor sill plate to decking,add bracing to h03 truss, add anchor bolt to Southwest patio column, provide engineer fix for chord to gusset plate in first floor hallway

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0224-00224
Permit Description: SFR RKK35O T22-M0068 Revision- Builder updates Structural and post tension
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/13/2024 COT - RSPL - Yard Water Line Passed Main water supply line is connected to city water with a meter installed. Water line is under street pressure with no leaks. Okay to shade pipe and backfill trench.
09/13/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to backwater valve and main sewer line, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
09/13/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to backwater valve and main sewer line, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
09/13/2024 COT - RSPL - Backwater Valve Passed Underground plumbing is connected to backwater valve and main sewer line, entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
09/26/2024 COT - RSEL - Grounding/Bonding Passed
09/26/2024 COT - RSBU - Preslab Passed
09/26/2024 COT - RSEL - Electrical Underground Passed
09/26/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
10/24/2024 COT - RSBU - Roof Nailing Passed 10-24-24, roof nailing approved.
11/25/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
11/25/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11/25/24: Engineering letter provided for truss repair. Okay to proceed with other work.
11/25/2024 BULD - Electrical Clearance Passed ECO CLEARANCE ISSUED.
11/25/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under a 15 psi air pressure test with no leaks. Okay to proceed with other work.
12/09/2024 COT - RSBU - Interior Shear Bracing Passed 12-9-24, shear wall bracing inspection approved. Okay to tape & texture drywall.
02/06/2025 COT - BULD - SWG Clearance Passed Passed SWG GAS CLEARANCE 2/6/24
02/25/2025 RSBU - Building Progress Passed
02/25/2025 COT - RSME - Mechanical Final Passed
02/25/2025 ENGR Engineering Final Passed CO Ready
Again if tree stakes are to be used they need to be finished
02/25/2025 COT - RSEL - Outdoor Lighting Passed
02/25/2025 COT - RSPL - Plumbing Final Passed
02/26/2025 RSBU - Building Final Passed 26 FEB 25
Pass, all corrections have been made.
02/26/2025 COT - RSEL - Electrical Final Passed 26 FEB 25
Pass, all corrections have been made.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V5.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT.-2024-07-08_V1.PDF DOCUMENTS VIEW