Permit: TC-MDP-0224-00193
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10665 E ROSY MARBLE DR
Address NEW:
10665 E ROSY MARBLE DR
Apply Date:
06/13/2024
Applicant:
Dana Petty
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00193
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/17/2024 | APPROVED |
| 01/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/06/2025 | APPROVED |
| 08/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/21/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00193
Permit Status: Complete
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 06/14/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 06/14/2024 | Post-Installed Anchor Inspection Report is required. | |
| 06/14/2024 | Post-Tension Inspection Report is required. | |
| 02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 06/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00193
Permite Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 10-17-24, reinforcement at hold downs, compaction required throughout, ufer requires 3 inches from earth, top and bottom reinforcement at guest suite #2 not per plans, footing depth not per plans. |
| 10/17/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 10-17-24, reinforcement at hold downs, compaction required throughout, ufer requires 3 inches from earth, top and bottom reinforcement at guest suite #2 not per plans, footing depth not per plans. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00193
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/09/2024 | COT - RSPL - Rough Soil | Passed | ||
| 10/09/2024 | COT - RSPL - Backwater Valve | Passed | ||
| 10/09/2024 | COT - RSPL - Sewer | Passed | ||
| 10/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 10/17/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 10/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/18/24: Items noted on last inspection are corrected. Okay to pour concrete. | |
| 10/18/2024 | COT - RSBU - Preslab | Passed | 10/18/24: Items noted on last inspection are corrected. Okay to pour concrete. | |
| 10/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Okay so proceed with M, P, AND E rough-in. | |
| 10/30/2024 | COT - RSBU - Roof Nailing | Passed | Okay so proceed with M, P, AND E rough-in. | |
| 12/09/2024 | BULD - Electrical Clearance | Passed | ECO CLEARANCE ISSUED. | |
| 12/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
| 12/09/2024 | COT - RSEL - Grounding/Bonding | Passed | Ground is properly secured to Ufer ground. | |
| 12/09/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of air pressure with no leaks. Okay to proceed. | |
| 12/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 02/10/2025 | COT - BULD - SWG Clearance | Passed | Pressure testing is complete and passed, sediment traps are installed on water heater, and gas valves are properly installed at gas appliance locations. SWG clearance issued for 10665 E Rosy Marble Dr | |
| 02/28/2025 | COT - RSEL - Electrical Final | Passed | Passed 2/28/25 CLEARANCE ECO | |
| 02/28/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 2/28/25 | |
| 02/28/2025 | COT - RSME - Mechanical Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | ENGR Engineering Final | Passed | Site is good, OK for CO. | |
| 02/28/2025 | RSBU - Building Final | Passed | Passed final 2/28/25 | |
| 02/28/2025 | RSBU - Building Progress | Passed | Passed final 2/28/25 |