Permit: TC-MDP-0224-00193
Permit Details
Apply Date:
06/13/2024
Applicant:
Daria Hopkins
Description:
SFR MERI150293 T21-M0067 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00193
Permit Status: Inspections
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/14/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 06/17/2024 | APPROVED |
08/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00193
Permit Status: Inspections
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
06/14/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
06/14/2024 | Post-Installed Anchor Inspection Report is required. |
06/14/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0224-00193
Permit Status: Inspections
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Date | Description | Comments |
---|---|---|
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/14/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0224-00193
Permite Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/17/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Re-inspection required | 10-17-24, reinforcement at hold downs, compaction required throughout, ufer requires 3 inches from earth, top and bottom reinforcement at guest suite #2 not per plans, footing depth not per plans. |
10/17/2024 | COT - RSBU - Preslab | N/A | Re-inspection required | 10-17-24, reinforcement at hold downs, compaction required throughout, ufer requires 3 inches from earth, top and bottom reinforcement at guest suite #2 not per plans, footing depth not per plans. |
COT - RSBU - Interior Shear Bracing | N/A | Scheduled |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0224-00193
Permit Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/09/2024 | COT - RSPL - Rough Soil | Passed | ||
10/09/2024 | COT - RSPL - Backwater Valve | Passed | ||
10/09/2024 | COT - RSPL - Sewer | Passed | ||
10/09/2024 | COT - RSPL - Yard Water Line | Passed | ||
10/17/2024 | COT - RSEL - Electrical Underground | Passed | ||
10/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/18/24: Items noted on last inspection are corrected. Okay to pour concrete. | |
10/18/2024 | COT - RSBU - Preslab | Passed | 10/18/24: Items noted on last inspection are corrected. Okay to pour concrete. | |
10/30/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Okay so proceed with M, P, AND E rough-in. | |
10/30/2024 | COT - RSBU - Roof Nailing | Passed | Okay so proceed with M, P, AND E rough-in. | |
12/09/2024 | BULD - Electrical Clearance | Passed | ECO CLEARANCE ISSUED. | |
12/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
12/09/2024 | COT - RSEL - Grounding/Bonding | Passed | Ground is properly secured to Ufer ground. | |
12/09/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15# of air pressure with no leaks. Okay to proceed. |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0224-00193
Status: Inspections
Description: SFR MERI150293 T21-M0067 REV1 roof covering change
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
12/23/2024 | COT - RSBU - Interior Shear Bracing | Scheduled |
For information about today’s scheduled inspections please refer to the