Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00188
Permit Details
Apply Date:
02/06/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00188
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/15/2024 | APPROVED |
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00188
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
02/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
02/08/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/15/2024 | Post-Tension Inspection Report is required. | |
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/07/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/07/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00188
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 9/13/24: canceled per contractor |
09/13/2024 | RSBU - Building Progress | N/A | Canceled | 9/13/24: canceled per contractor |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00188
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 22
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/10/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/10/2024 | COT - RSPL - Rough Soil | Passed | ||
05/10/2024 | COT - RSPL - Sewer | Passed | ||
05/22/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly spaced and on chairs to maintain separation from earth, masa clips are installed and spaced properly, shear wall hold downs are installed per plan, underground electrical is installed for kitchen island, additional rebar is in place per plans, Ufer ground is installed on left side of garage, and all plumbing pipes are properly wrapped with foam for protection from concrete. Okay to pour slab and footings. | |
05/22/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly spaced and on chairs to maintain separation from earth, masa clips are installed and spaced properly, shear wall hold downs are installed per plan, underground electrical is installed for kitchen island, additional rebar is in place per plans, Ufer ground is installed on left side of garage, and all plumbing pipes are properly wrapped with foam for protection from concrete. Okay to pour slab and footings. | |
05/22/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly spaced and on chairs to maintain separation from earth, masa clips are installed and spaced properly, shear wall hold downs are installed per plan, underground electrical is installed for kitchen island, additional rebar is in place per plans, Ufer ground is installed on left side of garage, and all plumbing pipes are properly wrapped with foam for protection from concrete. Okay to pour slab and footings. | |
05/22/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly spaced and on chairs to maintain separation from earth, masa clips are installed and spaced properly, shear wall hold downs are installed per plan, underground electrical is installed for kitchen island, additional rebar is in place per plans, Ufer ground is installed on left side of garage, and all plumbing pipes are properly wrapped with foam for protection from concrete. Okay to pour slab and footings. | |
06/07/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
06/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/10/2024 | BULD - Electrical Clearance | Passed | TEP ECO Clearance issued. | |
07/10/2024 | COT - RSPL - Backwater Valve | Passed | ||
07/10/2024 | COT - RSPL - Gas Pressure Test | Passed | Gas line is under 15 pounds of air pressure with no leaks. Okay to proceed. | |
07/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | Drywall on interior shear walls is properly installed and secured to the studs per plan requirements. Okay to proceed with drywall tape, texture, and paint. | |
09/11/2024 | COT - BULD - SWG Clearance | Passed | ||
09/19/2024 | COT - RSEL - Electrical Final | Passed | ||
09/19/2024 | COT - RSME - Mechanical Final | Passed | ||
09/19/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/19/2024 | ENGR Engineering Final | Passed | ||
09/19/2024 | RSBU - Building Final | Passed | ||
09/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/25/2024 | RSBU - Building Progress | Passed |