Inspection Status: Passed

Inspection History: COT - RSBU - Preslab  

Permit Number - TC-MDP-0224-00188

Inspection Description - COT - RSBU - Preslab  

Inspection Status - Passed

Date Description Inspector Results Comments
05/22/2024 COT - RSBU - Preslab   Passed Concrete forms are set, post tension cabling is properly spaced and on chairs to maintain separation from earth, masa clips are installed and spaced properly, shear wall hold downs are installed per plan, underground electrical is installed for kitchen island, additional rebar is in place per plans, Ufer ground is installed on left side of garage, and all plumbing pipes are properly wrapped with foam for protection from concrete. Okay to pour slab and footings.