Permit: TC-MDP-0224-00186
Permit Details
Apply Date:
03/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301600 T21-M0073 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0224-00186
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/02/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/03/2024 | APPROVED |
03/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 03/15/2024 | APPROVED |
09/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/26/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00186
Permit Status: Complete
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Date | Description | Comments |
---|---|---|
03/15/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
03/15/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
03/15/2024 | Post-Tension Inspection Report is required. | |
02/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
07/02/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
03/15/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00186
Permite Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/12/2024 | RSBU - Building Progress | N/A | Not Applicable | |
09/13/2024 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 9/13/24: canceled per contractor |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00186
Permit Description: SFR MER1301600 T21-M0073 REV1 roof covering change
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/15/2024 | COT - RSPL - Backwater Valve | Passed | ||
05/15/2024 | COT - RSPL - Sewer | Passed | ||
05/15/2024 | COT - RSPL - Yard Water Line | Passed | ||
05/15/2024 | COT - RSPL - Rough Soil | Passed | ||
05/24/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
05/24/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
05/24/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
05/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is in place per plans, shear wall hold downs and masa clips are installed per plan, underground electrical for kitchen island is installed, rebar reinforcement is placed per plan, Ufer ground is installed on side of garage, and all plumbing pipes are properly wrapped for protection. Okay to pour concrete for slab and footings. | |
06/12/2024 | COT - RSBU - Roof Nailing | Passed | Roof trusses are properly secured to top plate with nails and H2.5 hurricane ties. Plywood sheathing is securely attached to trusses with nails per plan. Okay to proceed with plumbing top out. | |
06/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Plywood sheathing for exterior shear walls is properly secured to studs per plan requirements. All masa clips and shear wall hold downs are properly nailed to bottom plates and wall studs. Bottom plates are secured with cut nails, titan bolts, or j-bolts. Okay to proceed with plumbing top out. | |
07/12/2024 | BULD - Electrical Clearance | Passed | ||
07/12/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
07/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
07/25/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/11/2024 | COT - BULD - SWG Clearance | Passed | ||
09/19/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/19/2024 | COT - RSEL - Electrical Final | Passed | ||
09/19/2024 | COT - RSME - Mechanical Final | Passed | ||
09/19/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/19/2024 | RSBU - Building Final | Passed | ||
09/19/2024 | ENGR Engineering Final | Passed | Contractor needs to remove all the construction material on the east side of the building contractor called me and informed me that they would clean up the construction material on the east end of the house and took a photo and sent it to me so I |