Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/05/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-0224-00181
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
10/24/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/24/2024 APPROVED Review Details
08/12/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/14/2024 APPROVED Review Details
02/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/13/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00181
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
02/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
02/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/13/2024 Post-Tension Inspection Report is required.
02/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
02/13/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0224-00181
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/21/2024 COT - RSPL - Sewer Passed 6/21/24: plumbing underground and Water line per plan ok to backfill. Shading required
06/21/2024 COT - RSPL - Yard Water Line Passed 6/21/24: plumbing underground and Water line per plan ok to backfill. Shading required
06/21/2024 COT - RSPL - Rough Soil Passed 6/21/24: plumbing underground per plan ok to backfill. Shading required
06/28/2024 COT - RSBU - Preslab Passed
06/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
06/28/2024 COT - RSEL - Grounding/Bonding Passed
06/28/2024 COT - RSEL - Electrical Underground Passed
07/12/2024 COT - RSBU - Roof Nailing Passed
07/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed
07/31/2024 BULD - Electrical Clearance Passed TEP ECO
07/31/2024 COT - RSPL - Gas Pressure Test Passed
08/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Corrections were made. 8/2/2024
08/15/2024 COT - RSBU - Interior Shear Bracing Passed
09/26/2024 COT - BULD - SWG Clearance Passed CLEARANCE for SWG 9/26/2024
10/03/2024 COT - RSEL - Outdoor Lighting Passed Passed 10/03/24
10/03/2024 ENGR Engineering Final Passed CO Ready, note weep holes in retaining wall.
10/14/2024 COT - RSEL - Electrical Final Passed Passed final inspection 10/14/24
10/14/2024 COT - RSME - Mechanical Final Passed Passed final inspection 10/14/24
10/14/2024 COT - RSPL - Plumbing Final Passed Passed final inspection 10/14/24
10/14/2024 RSBU - Building Final Passed Passed final inspection 10/14/24
10/14/2024 RSBU - Building Progress Passed Passed final inspection 10/14/24

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
148582 PT LOT 36 COMPLETE-2024-08-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 36 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 36 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 36 SPECIAL INSPECTION CERTIFICATE-2024-02-05_V1.PDF DOCUMENTS VIEW