Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00181
Permit Details
Apply Date:
02/05/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030
Permit Reviews
Permit Number - TC-MDP-0224-00181
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/24/2024 | APPROVED |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
02/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/13/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0224-00181
Permit Status: Complete
Permit Description: SFR 130.1600 T21-M0030
Date | Description | Comments |
---|---|---|
02/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/13/2024 | Post-Tension Inspection Report is required. | |
02/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0224-00181
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | COT - RSPL - Sewer | Passed | 6/21/24: plumbing underground and Water line per plan ok to backfill. Shading required | |
06/21/2024 | COT - RSPL - Yard Water Line | Passed | 6/21/24: plumbing underground and Water line per plan ok to backfill. Shading required | |
06/21/2024 | COT - RSPL - Rough Soil | Passed | 6/21/24: plumbing underground per plan ok to backfill. Shading required | |
06/28/2024 | COT - RSBU - Preslab | Passed | ||
06/28/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
06/28/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
06/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
07/31/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
07/31/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/02/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/2/2024 | |
08/15/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
09/26/2024 | COT - BULD - SWG Clearance | Passed | CLEARANCE for SWG 9/26/2024 | |
10/03/2024 | COT - RSEL - Outdoor Lighting | Passed | Passed 10/03/24 | |
10/03/2024 | ENGR Engineering Final | Passed | CO Ready, note weep holes in retaining wall. | |
10/14/2024 | COT - RSEL - Electrical Final | Passed | Passed final inspection 10/14/24 | |
10/14/2024 | COT - RSME - Mechanical Final | Passed | Passed final inspection 10/14/24 | |
10/14/2024 | COT - RSPL - Plumbing Final | Passed | Passed final inspection 10/14/24 | |
10/14/2024 | RSBU - Building Final | Passed | Passed final inspection 10/14/24 | |
10/14/2024 | RSBU - Building Progress | Passed | Passed final inspection 10/14/24 |