Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
05/20/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030

Permit Reviews

Permit Number - TC-MDP-0224-00179
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Start Date Submittal Complete Date Status  
09/18/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/18/2024 APPROVED Review Details
12/20/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/20/2024 APPROVED Review Details
05/20/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/24/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0224-00179
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Date Description Comments
05/21/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
05/21/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
05/21/2024 Post-Tension Inspection Report is required.
02/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
02/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/21/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Issued
Permit Number: TC-MDP-0224-00179
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 21
Date Description Inspector Results Comments
07/31/2024 COT - RSPL - Yard Water Line Passed
08/01/2024 COT - RSPL - Sewer Passed 8/1/2024 okay to backfill. Shading required.
08/01/2024 COT - RSPL - Rough Soil Passed 8/1/2024 okay to backfill. Shading required.
08/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
08/07/2024 COT - RSBU - Preslab Passed
08/07/2024 COT - RSEL - Electrical Underground Passed
08/07/2024 COT - RSEL - Grounding/Bonding Passed
08/26/2024 COT - RSBU - Exterior Clips/Sheathing Passed
08/26/2024 COT - RSBU - Roof Nailing Passed
09/20/2024 COT - RSPL - Gas Pressure Test Passed
09/24/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 9/24/2024
09/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. 9/26/2024
10/07/2024 COT - RSBU - Interior Shear Bracing Passed 10/7/24 passed
11/29/2024 COT - BULD - SWG Clearance Passed 11-13-24, approved for Southwest Gas clearance (SWG).
12/09/2024 COT - RSEL - Electrical Final Passed 12-9-24, outdoor lighting, electrical, mechanical, plumbing, and building finals approved.
12/09/2024 COT - RSEL - Outdoor Lighting Passed 12-9-24, outdoor lighting, electrical, mechanical, plumbing, and building finals approved.
12/09/2024 COT - RSME - Mechanical Final Passed 12-9-24, outdoor lighting, electrical, mechanical, plumbing, and building finals approved.
12/09/2024 COT - RSPL - Plumbing Final Passed 12-9-24, outdoor lighting, electrical, mechanical, plumbing, and building finals approved.
12/09/2024 ENGR Engineering Final Passed CO Ready
12/09/2024 RSBU - Building Final Passed 12-9-24, outdoor lighting, electrical, mechanical, plumbing, and building finals approved.
12/09/2024 RSBU - Building Progress Passed 12-9-24, outdoor lighting, electrical, mechanical, plumbing, and building finals approved.

Documents

File Name Document Type  
149438 PT LOT 48 COMPLETE-2024-09-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 48 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 48 SPECIAL INSPECTION CERTIFICATE-2024-05-20_V1.PDF DOCUMENTS VIEW