Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0224-00177
Permit Details
Apply Date:
04/16/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1600 T21-M0030
Permit Reviews
Permit Number - TC-MDP-0224-00177
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/16/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 04/22/2024 | APPROVED |
09/11/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/11/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0224-00177
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
02/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TC-MDP-0224-00177
Permit Status: Issued
Permit Description: SFR 130.1600 T21-M0030
Date | Description | Comments |
---|---|---|
04/18/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
04/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/18/2024 | Post-Tension Inspection Report is required. | |
02/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00177
Permite Description: SFR 130.1600 T21-M0030
Total Outstanding Inspections - 6
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/19/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | 11-19-24, missing post tension tag on hose bib, missing light bulb on patio light fixture, cut clean outs to grade, provide ladder for attic access. |
11/19/2024 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | 11-19-24, missing post tension tag on hose bib, missing light bulb on patio light fixture, cut clean outs to grade, provide ladder for attic access. |
11/19/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 11-19-24, missing post tension tag on hose bib, missing light bulb on patio light fixture, cut clean outs to grade, provide ladder for attic access. |
11/19/2024 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 11-19-24, missing post tension tag on hose bib, missing light bulb on patio light fixture, cut clean outs to grade, provide ladder for attic access. |
11/19/2024 | RSBU - Building Final | N/A | Re-inspection required | 11-19-24, missing post tension tag on hose bib, missing light bulb on patio light fixture, cut clean outs to grade, provide ladder for attic access. |
11/19/2024 | RSBU - Building Progress | N/A | Re-inspection required | 11-19-24, missing post tension tag on hose bib, missing light bulb on patio light fixture, cut clean outs to grade, provide ladder for attic access. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0224-00177
Permit Description: SFR 130.1600 T21-M0030
Total Completed Inspections - 15
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/16/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading is required. 7/16/2024 | |
07/16/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading is required. 7/16/2024 | |
07/16/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading is required. 7/16/2024 | |
07/23/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/23/2024 | COT - RSBU - Preslab | Passed | ||
07/23/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/23/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
08/07/2024 | COT - RSBU - Roof Nailing | Passed | ||
08/09/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Corrections were made. 8/9/2024 | |
09/03/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 9/3/2024 | |
09/03/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
09/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 9/5/2024 | |
09/23/2024 | COT - RSBU - Interior Shear Bracing | Passed | passed 9/23/24 | |
10/29/2024 | COT - BULD - SWG Clearance | Passed | 10-29-24, approved for Southwest Gas connection. | |
11/19/2024 | ENGR Engineering Final | Passed | CO Ready |
Scheduled Inspections
Scheduled Inspections - TC-MDP-0224-00177
Status: Issued
Description: SFR 130.1600 T21-M0030
Scheduled Date | Description | Entered By | Entered Date |
---|---|---|---|
11/22/2024 | RSBU - Building Final | Scheduled | |
11/22/2024 | COT - RSME - Mechanical Final | Scheduled | |
11/22/2024 | COT - RSEL - Outdoor Lighting | Scheduled | |
11/22/2024 | RSBU - Building Progress | Scheduled | |
11/22/2024 | COT - RSEL - Electrical Final | Scheduled | |
11/22/2024 | COT - RSPL - Plumbing Final | Scheduled |
For information about today’s scheduled inspections please refer to the
PDSD Daily Inspections Dashboards (Desktop)
PDSD Daily Inspections Dashboards (Mobile)
.