Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
06/27/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4002 T22-M0046

Permit Reviews

Permit Number - TC-MDP-0224-00167
Permit Status: Inspections
Permit Description: SFR LENNLE4002 T22-M0046
Start Date Submittal Complete Date Status  
06/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 07/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0224-00167
Permit Status: Inspections
Permit Description: SFR LENNLE4002 T22-M0046
Total Outstanding Activity Conditions - 6
Date Name
02/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
06/28/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/28/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
06/28/2024 Post-Tension Inspection Report is required.
06/28/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-0224-00167
Permit Status: Inspections
Permit Description: SFR LENNLE4002 T22-M0046
Date Description Comments
02/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/28/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0224-00167
Permite Description: SFR LENNLE4002 T22-M0046
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/10/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 12/10/24: Shot pins required at interior walls, RSP4 Clips missing throughout, MASA clips must be installed per manufacturer specifications (nails missing at MASA Clips), More than 1 in 3 MASA Clips with one leg up along wall line. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
12/10/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 12/10/24: Shot pins required at interior walls, RSP4 Clips missing throughout, MASA clips must be installed per manufacturer specifications (nails missing at MASA Clips), More than 1 in 3 MASA Clips with one leg up along wall line. STOPPED INSPECTION MORE ITEMS MAY BE ADDED.
01/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required 1-21-25,firefoam missing at top plate at back side of laundry room.
COT - RSBU - Interior Shear Bracing N/A Scheduled

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0224-00167
Permit Description: SFR LENNLE4002 T22-M0046
Total Completed Inspections - 13
Date Description Inspector Results Comments
11/13/2024 COT - RSPL - Rough Soil Passed 11-13-24, underground plumbing, main water line, sewer connection all per approved plans. Okay to proceed with construction.
11/13/2024 COT - RSPL - Sewer Passed 11-13-24, underground plumbing, main water line, sewer connection all per approved plans. Okay to proceed with construction.
11/13/2024 COT - RSPL - Yard Water Line Passed 11-13-24, underground plumbing, main water line, sewer connection all per approved plans. Okay to proceed with construction.
11/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 11-19-24, setbacks per approved plans. Okay to pour concrete.
11/19/2024 COT - RSBU - Preslab Passed 11-19-24, preslab per approved plans. Okay to pour concrete.
11/19/2024 COT - RSEL - Electrical Underground Passed
11/19/2024 COT - RSEL - Grounding/Bonding Passed 11-19-24, grounding/bonding per approved plans. Okay to pour concrete.
12/12/2024 COT - RSBU - Roof Nailing Passed 12/12/24 corrections made
12/12/2024 COT - RSBU - Exterior Clips/Sheathing Passed 12/12/24 corrections made
01/17/2025 BULD - Electrical Clearance Passed Ready for temp power 1/17/25
01/17/2025 COT - RSPL - Gas Pressure Test Passed Passed 1/17/25
01/17/2025 RSBU - Building Progress Passed Passed 1/17/25
01/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1'22/25 pass

Scheduled Inspections

Scheduled Inspections - TC-MDP-0224-00167
Status: Inspections
Description: SFR LENNLE4002 T22-M0046
Scheduled Date Description Entered By Entered Date
01/29/2025 COT - RSBU - Interior Shear Bracing Scheduled
For information about today’s scheduled inspections please refer to the PDSD Daily Inspections Dashboards (Desktop) PDSD Daily Inspections Dashboards (Mobile) .

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LE II 96 PLOT_V1.PDF DOCUMENTS VIEW
LE II 96 SIC-2024-06-27_V1.PDF DOCUMENTS VIEW