Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/29/2023
Applicant:
Dana Petty
Description:
SFR 235.2960 T21-M0055

Permit Reviews

Permit Number - TC-MDP-0223-00594
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
02/08/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/08/2024 APPROVED Review Details
06/30/2023 RESIDENTIAL NEW DWELLING v.1 07/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00594
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date Description Comments
06/30/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/08/2024 Post-Tension Inspection Report is required.
06/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
07/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00594
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
11/07/2023 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required Not ready.
01/02/2024 BULD - Electrical Clearance N/A Re-inspection required
01/02/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00594
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/02/2023 COT - RSPL - Yard Water Line Passed
10/02/2023 COT - RSPL - Sewer Passed
10/02/2023 COT - RSPL - Rough Soil Passed
10/11/2023 COT - RSBU - Preslab Passed
10/11/2023 COT - RSEL - Electrical Underground Passed
10/11/2023 COT - RSEL - Grounding/Bonding Passed
10/11/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/03/2023 COT - RSBU - Roof Nailing Passed
11/17/2023 COT - RSBU - Exterior Clips/Sheathing Passed
12/14/2023 COT - RSPL - Gas Pressure Test Passed
01/04/2024 BULD - Electrical Clearance Passed TEP ECO
01/04/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
01/22/2024 COT - RSBU - Interior Shear Bracing Passed
03/12/2024 COT - BULD - SWG Clearance Passed SWG for meter only
03/25/2024 ENGR Engineering Final Passed Grade cert. passed
Roof slate on sidewalk for unfinished roof.
Sewer cap needed in driveway.
03/25/2024 RSBU - Building Progress Passed
03/25/2024 COT - RSEL - Electrical Final Passed
03/25/2024 COT - RSEL - Outdoor Lighting Passed
03/25/2024 COT - RSME - Mechanical Final Passed
03/25/2024 COT - RSPL - Gas Final Passed
03/25/2024 COT - RSPL - Plumbing Final Passed
03/26/2024 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 29 FINAL SPECIAL INSPECTION CERT-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 29 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 29 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 29 SPECIAL INSPECTION CERTIFICATE-2023-06-29_V1.PDF DOCUMENTS VIEW