Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
06/29/2023
Applicant:
Daria Hopkins
Description:
SFR 235.2960 T21-M0055

Permit Reviews

Permit Number - TC-MDP-0223-00591
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Start Date Submittal Complete Date Status  
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details
06/30/2023 RESIDENTIAL NEW DWELLING v.1 07/05/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00591
Permit Status: Complete
Permit Description: SFR 235.2960 T21-M0055
Date Description Comments
06/30/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
02/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR EXPANSION ANCHORS IS REQUIRED.
06/30/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/07/2024 Post-Tension Inspection Report is required.
06/30/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
06/30/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/30/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00591
Permite Description: SFR 235.2960 T21-M0055
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
09/05/2023 COT - RSBU - Excavation/Rebar/Zoning N/A Re-inspection required 9/5/23: 2 STHD 8 at shearwalls are supposed to be STHD 10. Verify all STHD size and location
09/05/2023 COT - RSBU - Preslab N/A Re-inspection required 9/5/23: 2 STHD 8 at shearwalls are supposed to be STHD 10. Verify all STHD size and location
09/05/2023 COT - RSEL - Electrical Underground N/A Re-inspection required
09/05/2023 COT - RSEL - Grounding/Bonding N/A Re-inspection required 9/5/23: 2 STHD 8 at shearwalls are supposed to be STHD 10. Verify all STHD size and location
11/07/2023 BULD - Electrical Clearance N/A Re-inspection required Secure gas lines throughout, add more nails to nail plate for range vent, leak at first floor ceiling by bedroom entrance, properly support duct registers, add bang plate at top plate of first floor bedroom at plumbing, add correctly sized trimmer stud at right side of powder room door way under stairs, fix penetration at vapor barrier between ballon framed studs right side of front window and left side of front window, support 4-gang box at loft, missing clean outs at second floor, properly fire block horizontal chase at front house second floor pop out, over spanned studs at wall between bed. 2 and bed. 3, fractured top plate and stud at wall between bedroom 3 and hallway, support copper piping for bathtub and shower, supporting in second floor bathroom, open chases at back side of house behind shower, missing temp. gfci receptacle at electrical service.
11/07/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Re-inspection required Secure gas lines throughout, add more nails to nail plate for range vent, leak at first floor ceiling by bedroom entrance, properly support duct registers, add bang plate at top plate of first floor bedroom at plumbing, add correctly sized trimmer stud at right side of powder room door way under stairs, fix penetration at vapor barrier between ballon framed studs right side of front window and left side of front window, support 4-gang box at loft, missing clean outs at second floor, properly fire block horizontal chase at front house second floor pop out, over spanned studs at wall between bed. 2 and bed. 3, fractured top plate and stud at wall between bedroom 3 and hallway, support copper piping for bathtub and shower, supporting in second floor bathroom, open chases at back side of house behind shower, missing temp. gfci receptacle at electrical service.
02/20/2024 ENGR Engineering Final N/A Not Ready No, such address can’t find it

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00591
Permit Description: SFR 235.2960 T21-M0055
Total Completed Inspections - 22
Date Description Inspector Results Comments
08/23/2023 COT - RSPL - Rough Soil Passed Soil is wet.
08/23/2023 COT - RSPL - Sewer Passed Soil is wet.
08/23/2023 COT - RSPL - Yard Water Line Passed
09/26/2023 COT - RSBU - Roof Nailing Passed
09/26/2023 COT - RSBU - Exterior Clips/Sheathing Passed
09/26/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
09/26/2023 COT - RSBU - Preslab Passed
09/26/2023 COT - RSEL - Electrical Underground Passed
09/26/2023 COT - RSEL - Grounding/Bonding Passed
11/07/2023 COT - RSPL - Gas Pressure Test Passed
11/13/2023 BULD - Electrical Clearance Passed
11/13/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/30/2023 COT - RSBU - Interior Shear Bracing Passed
01/25/2024 COT - BULD - SWG Clearance Passed
02/20/2024 RSBU - Building Progress Passed
02/20/2024 RSBU - Building Final Passed
02/20/2024 COT - RSEL - Electrical Final Passed
02/20/2024 COT - RSEL - Outdoor Lighting Passed
02/20/2024 COT - RSME - Mechanical Final Passed
02/20/2024 COT - RSPL - Gas Final Passed
02/20/2024 COT - RSPL - Plumbing Final Passed
03/05/2024 ENGR Engineering Final Passed Grade cert. passed, no other issues.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 35 FINAL SPECIAL INSPECTION CERT-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 35 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 35 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 35 SPECIAL INSPECTION CERTIFICATE-2023-06-29_V1.PDF DOCUMENTS VIEW