Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
02/02/2023
Applicant:
Daria Hopkins
Description:
SFR 135.1870 T21-M0054

Permit Reviews

Permit Number - TC-MDP-0223-00580
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Start Date Submittal Complete Date Status  
03/09/2023 RESIDENTIAL NEW DWELLING v.1 03/15/2023 APPROVED Review Details
03/04/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/08/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00580
Permit Status: Complete
Permit Description: SFR 135.1870 T21-M0054
Date Description Comments
03/13/2023 Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents.
03/13/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/13/2023 Post-Installed Anchor Inspection Report is required.
03/13/2023 Post-Tension Inspection Report is required.
03/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
03/13/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00580
Permite Description: SFR 135.1870 T21-M0054
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/12/2023 COT - RSBU - Roof Nailing N/A Re-inspection required 6-12-23: No ladder for roof access.
09/29/2023 ENGR Engineering Final N/A Partial Pass Need gate installed and landscape cleaned and leveled.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00580
Permit Description: SFR 135.1870 T21-M0054
Total Completed Inspections - 23
Date Description Inspector Results Comments
05/16/2023 COT - RSPL - Rough Soil Passed
05/16/2023 COT - RSPL - Yard Water Line Passed
05/16/2023 COT - RSPL - Sewer Passed
05/30/2023 RSBU - Building Progress Passed pre-slab pass
05/30/2023 COT - RSPL - Backwater Valve Passed
05/30/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
05/30/2023 COT - RSBU - Preslab Passed
05/30/2023 COT - RSEL - Electrical Underground Passed
05/30/2023 COT - RSEL - Grounding/Bonding Passed
06/12/2023 COT - RSBU - Exterior Clips/Sheathing Passed
06/21/2023 COT - RSBU - Roof Nailing Passed
07/14/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/14/2023 COT - RSPL - Gas Pressure Test Passed
07/31/2023 COT - RSBU - Interior Shear Bracing Passed Inclusive home design, check thermostats for 54" oc above floor per plan.
08/28/2023 BULD - Electrical Clearance Passed
09/14/2023 COT - BULD - SWG Clearance Passed
09/29/2023 RSBU - Building Final Passed
09/29/2023 COT - RSEL - Electrical Final Passed
09/29/2023 COT - RSPL - Plumbing Final Passed
09/29/2023 COT - RSEL - Outdoor Lighting Passed
09/29/2023 COT - RSPL - Gas Final Passed
09/29/2023 COT - RSME - Mechanical Final Passed
03/05/2024 ENGR Engineering Final Passed Grade cert. passed, no other concerns

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 55 FINAL SIC FORM-2024-03-04_V1.PDF DOCUMENTS VIEW
LOT 55 FINAL SIC FORM-2024-03-04_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 55 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 55 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 55 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 55 SPECIAL INSPECTION CERTIFICATE-2023-03-06_V1.PDF DOCUMENTS VIEW