Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
05/09/2023
Applicant:
Daria Hopkins
Description:
SFR 235.2380 T21-M0052

Permit Reviews

Permit Number - TC-MDP-0223-00557
Permit Status: Complete
Permit Description: SFR 235.2380 T21-M0052
Start Date Submittal Complete Date Status  
05/11/2023 RESIDENTIAL NEW DWELLING v.1 06/06/2023 APPROVED Review Details
02/06/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/07/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00557
Permit Status: Complete
Permit Description: SFR 235.2380 T21-M0052
Date Description Comments
02/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
06/06/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
02/07/2024 Post-Tension Inspection Report is required.
06/06/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
06/06/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00557
Permit Description: SFR 235.2380 T21-M0052
Total Completed Inspections - 21
Date Description Inspector Results Comments
08/08/2023 COT - RSPL - Yard Water Line Passed
08/08/2023 COT - RSPL - Rough Soil Passed
08/08/2023 COT - RSPL - Sewer Passed
08/29/2023 COT - RSBU - Preslab Passed
08/29/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
08/29/2023 COT - RSEL - Electrical Underground Passed
08/29/2023 COT - RSEL - Grounding/Bonding Passed
09/14/2023 COT - RSBU - Exterior Clips/Sheathing Passed 9/14/23 strap,west shear wall in garage needs nailing will verify at intermediate
09/14/2023 COT - RSBU - Roof Nailing Passed
11/02/2023 COT - RSPL - Gas Pressure Test Passed
11/06/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
11/06/2023 BULD - Electrical Clearance Passed Not ready.
11/6/23: ECO TEP CLEARANCE
11/28/2023 COT - RSBU - Interior Shear Bracing Passed
01/25/2024 COT - BULD - SWG Clearance Passed
02/14/2024 RSBU - Building Progress Passed
02/14/2024 COT - RSEL - Outdoor Lighting Passed
02/14/2024 COT - RSPL - Gas Final Passed
02/14/2024 COT - RSPL - Plumbing Final Passed
03/08/2024 RSBU - Building Final Passed
03/08/2024 COT - RSEL - Electrical Final Passed
03/08/2024 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 38 FINAL SPECIAL INSPECTION CERT-2024-02-06_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 38 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 38 SPECIAL INSPECTION CERTIFICATE-2023-05-09_V1.PDF DOCUMENTS VIEW
LOT 38 PLOT PLAN_V1.PDF DOCUMENTS VIEW