Permit: TC-MDP-0223-00481
Permit Details
Apply Date:
02/03/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-0223-00481
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/06/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/06/2024 | APPROVED |
01/08/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 01/08/2024 | APPROVED |
02/07/2023 | RESIDENTIAL NEW DWELLING v.1 | 02/10/2023 | APPROVED |
05/01/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/01/2023 | APPROVED |
12/21/2023 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/22/2023 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0223-00481
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date | Description | Comments |
---|---|---|
02/08/2023 | Special inspections must be performed by an approved third party inspection agency at the owner's expense. Special inspection forms and reports are required to be submitted for review and approved prior to issuance of final approval documents. | |
02/08/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
12/22/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/08/2023 | Post-Installed Anchor Inspection Report is required. | |
02/08/2023 | Post-Tension Inspection Report is required. | |
06/06/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/15/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
06/06/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
06/15/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/08/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
02/08/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
05/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00481
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 24
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2023 | COT - RSPL - Rough Soil | Passed | pass | |
04/11/2023 | COT - RSPL - Sewer | Passed | pass | |
04/11/2023 | COT - RSPL - Yard Water Line | Passed | pass | |
04/17/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
04/17/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/17/2023 | COT - RSBU - Preslab | Passed | Okay for concrete placement. 4/17/2023 | |
04/26/2023 | COT - RSBU - Roof Nailing | Passed | 2-26-23: Roof sheathing has been properly nailed down. | |
05/01/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | 5-1-23: Plate washers have been placed at each sole plate bolt location. Headers meet the standards for framing. Truss clips are stamped with the Simpson logo. Okay to apply vapor barrier and stucco lathe to the exterior of building. | |
05/17/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
05/17/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
05/17/2023 | BULD - Electrical Clearance | Passed | TEP eco | |
05/17/2023 | RSEL - Electrical Progress | Passed | ||
05/17/2023 | RSME - Mechanical Progress | Passed | ||
05/17/2023 | RSPL - Plumbing Progress | Passed | ||
05/30/2023 | COT - RSBU - Interior Shear Bracing | Passed | ||
07/10/2023 | COT - RSPL - Gas Final | Passed | Gas valves have been installed in kitchen, laundry room, and garage for water heater. | |
07/24/2023 | RSBU - Building Final | Passed | ||
07/24/2023 | COT - RSEL - Electrical Final | Passed | ||
07/24/2023 | COT - RSME - Mechanical Final | Passed | ||
07/24/2023 | COT - RSPL - Plumbing Final | Passed | ||
07/24/2023 | COT - RSEL - Outdoor Lighting | Passed | ||
06/07/2024 | COT - BULD - SWG Clearance | Passed | ||
06/07/2024 | RSBU - Building Progress | Passed | ||
06/07/2024 | COT - RSEL - Electrical Underground | Passed |