Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
01/05/2024
Applicant:
Daria Hopkins
Description:
SFR MER1301460 T21-M0072

Permit Reviews

Permit Number - TC-MDP-0223-00416
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Start Date Submittal Complete Date Status  
05/16/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 APPROVED Review Details
01/05/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/11/2024 APPROVED Review Details
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0223-00416
Permit Status: Complete
Permit Description: SFR MER1301460 T21-M0072
Date Description Comments
01/05/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/05/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
05/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
05/17/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00416
Permite Description: SFR MER1301460 T21-M0072
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
08/12/2024 COT - RSEL - Electrical Final N/A Re-inspection required Wrong amperage on A/C Unit. 50 amp installed label on unit says 40 amp maximum.
08/12/2024 COT - RSME - Mechanical Final N/A Re-inspection required Wrong amperage on A/C Unit. 50 amp installed label on unit says 40 amp maximum.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0223-00416
Permit Description: SFR MER1301460 T21-M0072
Total Completed Inspections - 19
Date Description Inspector Results Comments
04/02/2024 COT - RSPL - Rough Soil Passed
04/02/2024 COT - RSPL - Sewer Passed
04/02/2024 COT - RSPL - Yard Water Line Passed
04/09/2024 COT - RSBU - Preslab Passed
04/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/09/2024 COT - RSEL - Grounding/Bonding Passed
04/09/2024 COT - RSEL - Electrical Underground Passed
04/29/2024 COT - RSBU - Roof Nailing Passed Trusses are properly secured to top plate with H2.5 clips and plywood sheathing is installed and secured to trusses per nail pattern on plans.
04/29/2024 COT - RSBU - Exterior Clips/Sheathing Passed All walls are properly secured to concrete floor, all shear walls are properly bolted down to floor and plywood sheathing is properly secured to studs per plan requirements, and all masa clips are properly secured to bottom plate.
05/23/2024 COT - RSPL - Gas Pressure Test Passed
05/23/2024 BULD - Electrical Clearance Passed TEP ECO
05/23/2024 RSBU - Building Progress Passed
05/28/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/21/2024 COT - RSBU - Interior Shear Bracing Passed
07/29/2024 COT - BULD - SWG Clearance Passed Gas valves are installed on each gas appliance location. Okay to install meter and turn on gas.
08/12/2024 COT - RSEL - Outdoor Lighting Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 RSBU - Building Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.
08/12/2024 ENGR Engineering Final Passed
08/12/2024 COT - RSPL - Plumbing Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI & GFCI breakers installed as required. Exterior lights are installed per plan requirements. Okay to issue Certificate of Occupancy for this permit.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
146819 PT LOT 210 COMPLETE-2024-05-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 210 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 210 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 210 SPECIAL INSPECTION CERTIFICATE-2024-01-05_V1.PDF DOCUMENTS VIEW