Permit: TC-MDP-0223-00406
Permit Details
Apply Date:
02/05/2024
Applicant:
Daria Hopkins
Description:
SFR 130.1460 T21-M0026
Permit Reviews
Permit Number - TC-MDP-0223-00406
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 11/18/2024 | APPROVED |
02/05/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 02/13/2024 | APPROVED |
08/12/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0223-00406
Permit Status: Complete
Permit Description: SFR 130.1460 T21-M0026
Date | Description | Comments |
---|---|---|
02/05/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
02/05/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
02/13/2024 | Post-Tension Inspection Report is required. | |
02/05/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
02/05/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
02/13/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0223-00406
Permit Description: SFR 130.1460 T21-M0026
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/21/2024 | COT - RSPL - Yard Water Line | Passed | 6/21/24: plumbing underground and Water line per plan ok to backfill. Shading required | |
06/21/2024 | COT - RSPL - Sewer | Passed | 6/21/24: plumbing underground per plan ok to backfill. Shading required | |
06/21/2024 | COT - RSPL - Rough Soil | Passed | 6/21/24: plumbing underground per plan ok to backfill. Shading required | |
07/02/2024 | COT - RSBU - Preslab | Passed | ||
07/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
07/02/2024 | COT - RSEL - Electrical Underground | Passed | ||
07/02/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
07/16/2024 | COT - RSBU - Roof Nailing | Passed | ||
07/16/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
08/06/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/6/2024 | |
08/15/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
08/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Add h25 or detail 14B at bearing points for trusses in garage area. Secure gas line in garage area. Gas line not stubbed into dryer box. Move over pex line in hallway near garage from can light and master bathroom. Add blocking to register above kitchen island. Receptacles in great room are exceeding 12'. Add nail plates to vent line in 2nd bedroom. EV charging line in 1st bedroom and kitchen hood closet area. 8/15/2024 Secure gas line in garage area. Add nail plates to vent line in 2nd bedroom. EV charging line in 1st bedroom and kitchen hood closet area. 8/19/2024 Corrections were made. 8/21/2024 8-21-2024, previously passed on 8-20-2024. Verified with point of contact |
|
08/30/2024 | COT - RSBU - Interior Shear Bracing | Passed | 8/30/24:passed | |
10/17/2024 | COT - BULD - SWG Clearance | Passed | PASSED SW GAS CLEARANCE 10/17/24 | |
10/17/2024 | COT - RSEL - Electrical Final | Passed | PASSED FINAL INSPECTION 10/17/24 CLEARANCE ECO | |
10/17/2024 | COT - RSEL - Outdoor Lighting | Passed | PASSED FINAL INSPECTION 10/17/24 | |
10/17/2024 | COT - RSME - Mechanical Final | Passed | PASSED FINAL INSPECTION 10/17/24 | |
10/17/2024 | COT - RSPL - Plumbing Final | Passed | PASSED FINAL INSPECTION 10/17/24 | |
10/17/2024 | RSBU - Building Final | Passed | PASSED FINAL INSPECTION 10/17/24 | |
10/17/2024 | RSBU - Building Progress | Passed | PASSED FINAL INSPECTION 10/17/24 | |
10/25/2024 | ENGR Engineering Final | Passed | Remove roll-off from front of SFR. extend conduit from irrigation controller to below grade. |