Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Permit Number - TC-MDP-0223-00406
Inspection Description - COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
Inspection Status - Re-inspection required
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/15/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Add h25 or detail 14B at bearing points for trusses in garage area. Secure gas line in garage area. Gas line not stubbed into dryer box. Move over pex line in hallway near garage from can light and master bathroom. Add blocking to register above kitchen island. Receptacles in great room are exceeding 12'. Add nail plates to vent line in 2nd bedroom. EV charging line in 1st bedroom and kitchen hood closet area. 8/15/2024 | |
08/19/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | Secure gas line in garage area. Add nail plates to vent line in 2nd bedroom. EV charging line in 1st bedroom and kitchen hood closet area. 8/19/2024 | |
08/21/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections were made. 8/21/2024 | |
08/22/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Add h25 or detail 14B at bearing points for trusses in garage area. Secure gas line in garage area. Gas line not stubbed into dryer box. Move over pex line in hallway near garage from can light and master bathroom. Add blocking to register above kitchen island. Receptacles in great room are exceeding 12'. Add nail plates to vent line in 2nd bedroom. EV charging line in 1st bedroom and kitchen hood closet area. 8/15/2024 Secure gas line in garage area. Add nail plates to vent line in 2nd bedroom. EV charging line in 1st bedroom and kitchen hood closet area. 8/19/2024 Corrections were made. 8/21/2024 8-21-2024, previously passed on 8-20-2024. Verified with point of contact |