Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9993 E LEBARON DR
Apply Date:
02/02/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 2685 Plan (Model master plan TC-MDP-0725-00414)

Permit Reviews

Permit Number - TC-MDP-0126-00016
Permit Status: Inspections complete
Permit Description: Mirador Ridge Blossom 2685 Plan (Model master plan TC-MDP-0725-00414)
Start Date Submittal Complete Date Status  
07/27/2026 SPECIAL INSPECTION REVIEW v.2 07/28/2026 APPROVED Review Details
07/27/2026 SPECIAL INSPECTION REVIEW v.1 07/27/2026 REQUIRES RESUBMIT Review Details
02/05/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 02/13/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0126-00016
Permit Status: Inspections complete
Permit Description: Mirador Ridge Blossom 2685 Plan (Model master plan TC-MDP-0725-00414)
Date Description Comments
01/14/2026 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
02/10/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
01/14/2026 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/14/2026 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
01/14/2026 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/14/2026 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00016
Permite Description: Mirador Ridge Blossom 2685 Plan (Model master plan TC-MDP-0725-00414)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/24/2026 RSBU - Building Final N/A Partial Pass Partial pass. Correction was made. Pending unsatisfied conditions. 7/24/2026
07/21/2026 ENGR Engineering Final N/A Not Ready 7/21/26
Outstanding condition needs to be satisfied before final inspections.
-Air leakage and duct tightness.
-Sewer release
-concrete installation
-post tension slab

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0126-00016
Permit Description: Mirador Ridge Blossom 2685 Plan (Model master plan TC-MDP-0725-00414)
Total Completed Inspections - 20
Date Description Inspector Results Comments
03/06/2026 COT - RSPL - Yard Water Line Passed 03/06/2026
Holding under air test with blue tracer wire in clean trench - ok to backfill with shading material.
03/06/2026 COT - RSPL - Rough Soil Passed 03/06/2026
All fixtures present and under test with proper directional flow in clean trench - ok to backfill with shading material.
03/17/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 3/17/2026
Approved per site plan and reinforcement. Ok to pour.
03/17/2026 COT - RSBU - Preslab Passed 3/17/2026
Approved per site plan and reinforcement. Ok to pour.
03/17/2026 COT - RSEL - Electrical Underground Passed
04/08/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 04/08/2026
Corrections made to prior inspection. Verified truss calcs and bracing.
04/08/2026 COT - RSBU - Roof Nailing Passed 04/08/2026
Corrections made to prior inspection. Verified truss calcs and bracing.
05/12/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/12/2026 BULD - Electrical Clearance Passed Approved for eco
05/12/2026 COT - RSPL - Gas Pressure Test Passed
05/27/2026 COT - RSBU - Interior Shear Bracing Passed
06/22/2026 COT - RSPL - Sewer Passed
07/15/2026 COT - BULD - SWG Clearance Passed 7-15-26 SWG Clearance Approved
07/21/2026 RSBU - Building Progress Passed
07/21/2026 COT - RSPL - Plumbing Final Passed
07/21/2026 COT - RSEL - Outdoor Lighting Passed
07/23/2026 COT - RSEL - Electrical Final Passed
07/23/2026 COT - RSME - Mechanical Final Passed
07/27/2026 RSBU - Building Final Passed
07/27/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
AIR BAL. RPT-AIR-2026-07-27_V1.PDF DOCUMENTS VIEW
FINAL SIC - MIRADOR RIDGE BLOSSOM LOT 49-2026-07-21_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 49 START_V1.PDF DOCUMENTS VIEW
MRB 49 SIC-2026-02-02_V1.PDF DOCUMENTS VIEW